| 1 | L1₹4.0 LAccepted-Finance | ₹4.0 L | L1 | Accepted-Finance Low rate Quoted |
| 2 | L2₹4.1 LRejected-Finance NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | ₹4.1 L | L2 | Rejected-Finance higher rate Quoted |
| Sl No | Description | Qty | Unit | M/s. New Mohana Constructions L2 | R.K.RANIEL L1 |
|---|---|---|---|---|---|
| 1.00Desiliting of Eswaran koil kulam dimonds in( 35m x 35Width x1.50 Depth) dimonds for Baby pond 10mx5mx1.00m) @ Pinjivakkam village in Pinjivakkam Panchayat Kadambathur Block | |||||
| 2.00 | Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8) | 1,500 | m3 | 6 ₹9,000 | 5 ₹7,500 Lowest |
| 3.00 | Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification. | 966.36 | m3 | 53.04 ₹51,256 | 52 ₹50,251 Lowest |
| 4.00 | Supplying and Filling with good river sand rate including materilas cost and conveyance and all other labour charges etc completed | 9.41 | m3 | 1,999.2 ₹18,812 | 1,960 ₹18,444 Lowest |
| 5.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete | 9.41 | m3 | 5,519.02 ₹51,934 | 5,410.8 ₹50,916 Lowest |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for planeBroken Granite surface in foundation and basement and in all floors for R C C column footing laying, watering column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc | 76.76 | m3 | 486.54 ₹37,347 | 477 ₹36,615 Lowest |
| 7.00 | Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete | 22.52 | mt | 5,851.74 ₹1,31,781 | 5,737 ₹1,29,197 Lowest |
| 8.00 | Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete | 1.84 | m3 | 6,901.93 ₹12,700 | 6,766.6 ₹12,451 Lowest |
| 9.00 | Rough stone dry packing including cost and conveyance of all labour charges etc complete | 5.75 | m3 | 2,416.91 ₹13,897 | 2,369.52 ₹13,625 Lowest |
| 10.00 | Pointing the rough stone dry packing with cement mortar 1:3 mix including all charges | 25 | m3 | 250.27 ₹6,257 | 245.36 ₹6,134 Lowest |
Tender Value
₹4.1 L
EMD Value
₹4,200
Closing Date
11 Mar 2024, 3:00 pmClosed
BDO(V.P)Kadambathur Block
BDO(V.P)Kadambathur Block
. Desiliting of Eswaran koil kulam dimonds in 35m x 35Width x1.50 Depth) dimonds for Baby pond 10mx5mx1.00m) at Pinjivakkam village in Pinjivakkam Panchayat
2024_RDTN_441303_1
RCNO757/2023/A7DATE 04.03.2024
Open Tender
Civil Works
Item Rate
Kadambathur Block
Contractors Pre Qualification Details
4 documents required · 4 mandatory
₹0
₹4,200
Yes
BDO(V.P)Kadambathur Block
14 Aug 2026
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
6 Mar 2024
Amount
Desiliting of Eswaran koil kulam dimonds in( 35m x 35Width x1.50 Depth) dimonds for Baby pond 10mx5mx1.00m) @ Pinjivakkam village in Pinjivakkam Panchayat Kadambathur Block
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Supplying and Filling with good river sand rate including materilas cost and conveyance and all other labour charges etc completed
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Supplying and erecting centering shuttering including necessary supports for planeBroken Granite surface in foundation and basement and in all floors for R C C column footing laying, watering column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Rough stone dry packing including cost and conveyance of all labour charges etc complete
Pointing the rough stone dry packing with cement mortar 1:3 mix including all charges
R.R.Masonry in CM 1:5 using rough stones
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. New Mohana Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].