SE/NEDE/NAMAKKAL
Supatowers, T.gode Road ,Namakkal
Providing new cable duct with cover slabs in some of the areas at Kalappanaickenpatty 110KV SS at Namakkal EDC.
2026_EB_710966_1
Spc 08/2026-27,Dt.03.10.2026
Open Tender
Civil Works
Works
NAMAKKAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,700
Yes
5 Oct 2026
5 Oct 2026
22 Oct 2026
5 Oct 2026
21 Oct 2026
5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard stiff clay, stiff block cotton hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelley soil with an initial lead of 10m and lift of 2 m including cost of all materials lead and lift etc., complete and directed by Engineer at site. | 176.67 | M3 | - | - |
| 2 | Plain cement concrete 1:4:8 using 40mm size graded HBG stone including cost of all materials labour, curing charges, lead lifts etc., complete for foundation & flooring. | 10.93 | M3 | - | - |
| 3 | Brick Work in C.M.1:5 using Second class Ground moulded chamber Burnt Bricks including cost of all materials ,curing and labour charges, all lead and lifts ,complete. | 54.05 | M3 | - | - |
| 4 | Plastering with CM 1:5, 12mm thick on interior faces including cost of all materials, labour, curing charges, all leads & lifts etc., complete and as directed by Engineer at site. | 227.62 | M2 | - | - |
| 5 | Supply and fixing of 55x55x5mm MS angles for fixing cable duct tray including cost of all materials, labour charges, all leads& lifts etc ,complete. | 1,525 | Kg | - | - |
| 6 | Providing R.C.C (1:1.5:3) mix using 12 to 20mm HBG machine crushed metal for precast cover slab for cable duct including cost of all materials , shuttering charges , lead, lift Transport, head load lead, labour charges, finishing the joints centering and curing etc., Excluding rods Complete. | 6.72 | M3 | - | - |
| 7 | Providing Ribbed Tor Steel for Reinforecement rods in RCC including Cutting, Bending, Tying and fixing in Position as per Specification & Drawing, including Cost of all Materials, Steel Binding Wire, All leads & Lifts etc, complete. | 469.67 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_854179.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .