| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹15.9 L+₹59,663.50 (3.75%)Accepted-AOC | L2 | Accepted-AOC La | |
| 2 | L1₹15.9 LRejected-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L1 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents Incomplete |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
1 Oct 2021, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
M.G.C.C.D-5, Bijnor
Construction of V.R.B at km. 7.765 and Construction of canal from km. 7.700 to km. 7.800 of KUNDERKI DY under Madhya Ganga Canal stage-II.
2021_UPIDC_623673_5
07/EE/2021-22
Open Tender
Civil Works - Bridges
Item Wise
90 days
kundarki
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹35,000
30 Nov 2021
25 Sept 2021
1 Oct 2021
25 Sept 2021
1 Oct 2021
25 Sept 2021
Amount
Earth work in embankment in ordinary soil in 20cm layer including ramming , dressing the surface to the requried leveland slope s also i/c avg carriage 1.00Km up to work site with all lead & lift , T&P, etc. as per direction of Engineer-in -Chief. per Cum
Earth work in excavation or digging for making Rajwaha including lead upto 30 m and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. complete as per direction of Engineer-in-Chief per Cum.
Earth work in excavation foundation in ordinary soil (lomy,clay or sand) including lift 1.50 M & lead upto 30 M and including filling watering and ramming of excavation earth into the trench.
Cement concrete in 1:3:6 (M-10) including all cost of material, labour,T&P etc .
Reinforcment Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Reinforcement Cement concrete in 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work per cum.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering of line ply wood shuttering for R.C.C. Work including all cost of material, labour and T&P etc. for proper completion of work per Sqm.
Centering & Shuttering C.C. Work including all cost of material, labour and T&P etc. for proper completion of work .
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement Pointing 1:2 (struck deep ) on brick masonry i/c all cost of material, labour, T&P etc.
supply and filling ordinary sand including 30 m lead and 1.5 m lift, cost of material, labour, T&P etc.
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete.
S/F of 100 mm dia 0.60M length G.I. pipe as drainage spout including cost of all material , labour and T&P etc. for proper completion of work.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Supplying and laying of dry brick on edge, filling joint including all cost of material, labour and T&P etc. all complete.
Supplying and laying of R.B.M. i/c cost of all material ,labour ,T&P etc required for proper completion of work
Earth work for making diversion in ordinary soil in 20cm layer including ramming , dressing the surface to the requried level and slope also i/c avg carriage 1.00Km up to work site with all lead & lift , T&P, etc. as per direction of Engineer-in -Chief. per Cum
Earth work in cutting or in embankment in ordinary soil for Removal of diversion including 1.50 m lift and up to 100 m lead Including cost of all materials, labour, T&P etc. required for proper completion of work.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per RM.
Supply and Fixing diversion sign board size 1.50x1.00M, Including cost of all materials, labour, T&P etc. required for proper completion of work/ No.
YADVENDER SINGH CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .