Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.1 LAccepted-Finance | ₹50.1 L | L1 | Accepted-Finance LOWER AMOUNT |
| 2 | L2₹50.1 L+₹2,508.38 (0.05%)Rejected-Finance | ₹50.1 L+₹2,508.38 (0.05%) | L2 | Rejected-Finance HIGHER AMOUNT |
| 3 | L3₹50.2 L+₹5,016.75 (0.10%)Rejected-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | ₹50.2 L+₹5,016.75 (0.10%) | L3 | Rejected-Finance HIGHER AMOUNT |
Tender Value
₹50.2 L
EMD Value
₹5.0 L
Closing Date
24 Apr 2026, 11:00 amClosed
EO
GOHAND
Construction work of retaining wall and ghat in Prabhakar pond in Mu. Vivekanand ward no. 5.
2026_DOLBU_1133162_1
795/npgohand/talab/02.04.26
Open Tender
Civil Works
Percentage
180 days
GOHAND
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EO
₹5.0 L
24 Apr 2026
4 Apr 2026
24 Apr 2026
4 Apr 2026
24 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Photography work etc. | - | Job. | - | - |
| 2 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (S.I. No-257) As in item 251 a above but excavation in black cotton soil in Bundelkhand area requiring use of special tools and plants such as pick axes and sabbals etc. | - | Cum | - | - |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. (S.I. No.255) | - | Cum | - | - |
| 4 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (S.I. No.-273) | - | Cum | - | - |
| 5 | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.(Chapter No.-8) | - | Cum | - | - |
| 6 | Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 finerness modulus. As Per Item-574 | - | Sqm | - | - |
| 7 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I. No.279-a | - | Cum | - | - |
| 8 | Earth work in filling by cartage earth including loading & unloading cartage from 4.00 km. distance from out of city. | - | Cum | - | - |
| 9 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (S.I. No-257) | - | Cum | - | - |
| 10 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1 : 4 : 8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (S.I. No.-273) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_2115193.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .