Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹26.5 L+₹1,329.68 (0.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.6 L+₹3,989.06 (0.15%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹31.4 L
EMD Value
₹2.7 L
Closing Date
8 Jun 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Road improvement work by CC in Ward No. 10 Raipura Road from Jain godown to Dr. Gyan Singh, from Ambedkar Park to Amar Das, from Mistry to Neeraj house, Bhimpath, Bhuri Singh streets.
2026_DOLBU_1148095_47
02/Nirman_N-Cap/2026-27 Date - 13/05/2025
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,138
Municipal Corporation
₹2.7 L
1 Jul 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only) (PWD SOR 2022-23, Chepter-20, Serial No.19 Item No. New) | 286 | Cum | 10 | ₹2,860 |
| 2 | Deduction of old interlocking tiles | 2,002 | Cum | 4.6 | ₹9,209.2 |
| 3 | Cartage of malva from site up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2022-23, Chepter-3, Item No. 231a ) | 18.3 | Cum | 230.1 | ₹4,210.83 |
| 4 | Providing and laying cement concrete in 1:4:8 Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 3 Spec. No.4.1). | 25.45 | Cum | 5,650 | ₹1,43,792.5 |
| 5 | Class-150 (Non Modular) brick work in 1:4 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (Fine sand not less than in 1.25 FM) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1 A spec. No. 6.1.1 A) | 19.62 | Cum | 5,500 | ₹1,07,910 |
| 6 | 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1) | 284.2 | Cum | 200 | ₹56,840 |
| 7 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side fromwork .......................... 1501 (approved Quarri grit) (PWD SOR 2025-26, Chepter-12, SI N0-11). | 273.47 | Cum | 7,700 | ₹21,05,719 |
| 8 | Supply & Laying precast concrete blocks (Interlocking Tiles) for paving of thickness 80mm (Compresive strength not less then 30 mpa) Including 25 mm theick local sand Base leveling and dressing of surface to requred level and slope] filling Jointsa With local sand all complete work as speciefied in IS 15658:2006. (PWD SOR 2025-26 Chapter No-12 SI No. 10 New Item) | 143 | Cum | 840 | ₹1,20,120 |
| 9 | Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2024-25 Chapter No-05 Item No. 7 spec. No. 4.1) | 12.33 | Cum | 6,600 | ₹81,378 |
| 10 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal
size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | 2.4 | Cum | 7,650 | ₹18,360 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2149124.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .