| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.7 LAdmitted-Finance | -50.79% | ₹11.7 L | L1 | Admitted-Finance |
| 2 | L2₹12.8 LAdmitted-Finance | -45.99% | ₹12.8 L | L2 | Admitted-Finance |
| 3 | L3₹13.7 LAdmitted-Finance | -42.59% | ₹13.7 L | L3 | Admitted-Finance |
| 4 | L4₹13.7 LAdmitted-Finance | -42.31% | ₹13.7 L | L4 | Admitted-Finance |
| 5 | L5₹16.1 LAdmitted-Finance | -32.12% | ₹16.1 L | L5 | Admitted-Finance |
Tender Value
₹23.8 L
EMD Value
₹47,580
Closing Date
21 Jan 2026, 4:00 pmClosed
ADGP HQrs PHQ
Jammu
Construction
2026_DGPJK_300518_8
e-NIT/EE-PCD/PHQ/165/2025-26
Open Tender
Civil Works
60 days
SSG building Jammu
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Exen PCD PHQ
₹47,580
4 Feb 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
21 Jan 2026
15 Jan 2026
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used With G.I. barbed wire
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Disposal of earth work incluidng of disposal of excavated earth lead 50 mtr upto 1 km and lift upto 1.5 m as directed by EIC all kind of soil
Carriage of material by mechanical transport including all loading / unloading complete
Sands Aveg. lead of 10 Km
Stone aggregate upto 40mm and above Aveg. lead of 10 Km
Stone aggregate below 40mm and above Aveg. lead of 10 Km
Bricks Aveg. lead of 15 Km
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
BOQ_974955.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid