Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
17 Jun 2026, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
P.WAY
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Definition of Similar Work : - Execution of P.way works.
17 conditions · 6 needing a document upload
Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderer's. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender. Annexure Description 1. Annexure-I(a) Details of the Works Completed by the Tenderer during the last seven years to be filled & submitted as per Annexure-I(a). 2. Annexure-I(b) Details of contractual payment received by the Tenderer during the last 3 (three) financial years including the current financial year to be filled & submitted in Annexure-I(b). 3 Annexure-II Details of Plants and Machinery with the Tenderer to be filled & submitted as per Annexure- II. 4 Annexure-III Details of Personnel and Organization of the Tenderer to be filled & submitted as per Annexure-III. 5 Annexure-IV Details of Works Presently on hand of the Tenderer to be filled & submitted as per Annexure- IV. 6 Annexure-V Details regarding Association of Railway Officer(s) with the tenderer to be filled & submitted as per Annexure- V. 7 Annexure-VI List of the Arbitration Cases of the Tenderer during last five years to be filled & submitted as per Annexure-VI. 8 Annexure-VII List of the Court Cases of the Tenderer during last Five years to be filled & submitted in Annexure- VII. 9 Annexure- VIII NEFT MANDATE FORM. All Payments to the agency (including the refund of the Bid Security of the unsuccessful bidder preferably) will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure- VIII. 10 Annexure-IX GST COMPLAINT INVOICE : To be filled & submitted as per Annexure-IX. 11 Annexure-X FORMAT FOR CERTIFICATE TO BE SUBMITTED / UPLOADED BY TENDERER ALONGWITH THE TENDER DOCUMENTS as per Annexure-X. 12. Annexure-X(A)-This certificate is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV)/Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. 13. Annexure-XI LETTER OF CREDIT: To be filled & submitted as per Annexure-XI. 14.Annexure-XII BID SECURITY: Bank Guarantee Bond from any scheduled commercial bank of India to be filled & submitted as per Annexure-XII. 15.Annexure-XIII Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) to be filled & submitted as per Annexure-XIII. 16. Annexure- XIV TENDER FORM (FIRST SHEET)- Tender Form (First Sheet) to be filled & submitted as per Annexure-XIV. 17.Annexure-XV TENDERER'S CREDENTIALS (BID CAPACITY) to be submitted as per Annexure-XV. (This annexure will be applicable, if tender having advertised value more than Rs 20 crore wherein eligibility criteria includes bid capacity)
Annual Contractual Turnover Data:- Each Bidder or each member of a JV must fill details of Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) in annexure-VIB form separately and submit the same with the offer followed by the guidelines as mentioned in this annexure. The format of Annexure-VIB is available in commercial compliance-Annexure in documents section of this tender.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT , etc. are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII,IX,XI, XII, XIII, XIV. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderer's.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Open tender for TSR(P) using PQRS machine in the jurisdiction of AEN/2/ASN under Sr.DEN/1/ASN.
O-AC-T-38-26-27~ER
O-AC-T-38-26-27
Open
Works - General
12 Months
Paschim Bardhaman, West Bengal
₹0
₹5.4 L
17 Jun 2026
22 May 2026
3 Jun 2026
7 items across 1 schedule · ₹57,33,924.1 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Fabrication of service panels at base of length varying from 12M to 13.2 M with 52 Kg/90 R. rails on PSC sleepers of 60 Kg. Spaced at 60 cm centre to centre or according to the instruction given by the PWI/PQRS at site.This includes the following: a) Placing service rail on concrete sleepers, squaring & spacing of PSC sleepers @ 60 cm. This will include leading service rails from anywhere in the base yard , crossing lines with lead , lift etc. b) Fastening of service rails with concrete sleepers with full complete fittings i.e. M.S Liners / GFN Liners, Grooved Rubber Pads & Pandrol Clips. MCI inserts & Pandrol Clips are to be properly greased after cleaning by wire brushes. Grease to be supplied by contractor as graphite grease 'O' to IS: 408. | Per Track Metre | 25126.00 | 33.61 | 8,44,484.86 |
| 2 | Unloading /loading of PSC sleepers (old/new) from BFR/BRH/KCF wagons leading them for stacking within 200 M by deploying contractor's own mechanical means like self propelled mechanical gantries / portal cranes and spreading of PSC sleepers from stacking area at fabrication site with proper spacing. The contractor's gantries/portal cranes shall be maintained, operated & supervised by his own labour and at his own cost. | Each | 41710.00 | 16.43 | 6,85,295.3 |
| 3 | Dismantling of released panels from all types of sleepers and of varying length 12 mtrs. to 13.2 mtrs long etc. All the labour required for freeing any obstruction etc. shall be provided by the contractor. The work includes unfastening of sleepers of any type from rails & segregating of CST/9 sleepers i.e. separating tie bars, split cotters, T. way Keys & CST/9 plates. Each material including rails will be stacked properly and separately within lead of 200 mtrs. | Per Track Metre | 25126.00 | 47.4 | 11,90,972.4 |
| 4 | Fixing of GR pads on rail seats of PSC sleepers with approved quality of glue (Is 505 fevicol) before fabrication of panels. The rate should include :i) Supply of brush for application to be done by contractor and surface to be cleaned before application of glue (ii) Total surface area under GR Pad and of PSC sleeper between insert where GR Pad is to be fixed to be uniformly glued with sufficient quantity of glue as instructed by Site - in - Charge. | Each | 86740.00 | 4.86 | 4,21,556.4 |
| 5 | Laying of auxiliary track in base with 3.4 m gauge coinciding with the center lines of running track of PQRS base, providing adequate number of supports @ 2m C/C with CST/9 pots, wooden block ( to be supplied free by Rly.). The rate includes pairing & butting, leveling & packing under supports, trolleying single rails / 3 Rail panels etc. as per PWI Incharge of PQRS base. | Per Track Metre | 400.00 | 47.41 | 18,964 |
| 6 | Loading of fabricated panels on BFR by deploying contractor's own mechanical gantries / portal cranes including all lead & lift. The gantries / portal cranes shall be maintained, operated & supervised by his own labour at his own cost. | Per Track Metre | 25126.00 | 52.78 | 13,26,150.28 |
| 7 | Unloading of released panels by contractor's gantry including supply of labourer and removing obstructions encountered in the process. | Per Track Metre | 25126.00 | 49.61 | 12,46,500.86 |
| Schedule total | ₹57,33,924.1 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022_2.pdf
ATTACHMENT
Tenderdocuments.pdf
ATTACHMENT
AnnexuresforCommercialcompliances.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
ANNEXURE-X_A_.pdf
ATTACHMENT
Annexure-X_1.pdf
ATTACHMENT
Annexuresoftechnicalcompliancess.pdf
ATTACHMENT
ACSlipsGCC-2022.pdf
ATTACHMENT
JPOTelecomcircular9of2023_1.pdf
ATTACHMENT
AdvancecorrectionslipNo11ofGCC2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .