| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED DUE TO LOWEST | |
| 2 | L2₹38.9 L+₹10.2 L (35.4%)Rejected-AOC | L2 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 3 | L3₹39.3 L+₹10.6 L (36.8%)Rejected-AOC | L3 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 4 | L4₹39.8 L+₹11.1 L (38.7%)Rejected-AOC | L4 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 5 | L5₹39.9 L+₹11.2 L (38.9%)Rejected-AOC | L5 | Rejected-AOC REJECTED DUE TO NOT LOWEST |
Tender Value
₹29 L
EMD Value
₹58,000
Closing Date
9 May 2022, 6:00 pmClosed
GE (AF) LOHEGAON
GE (AF) LOHEGAON, PUNE -411032
CONSTRUCTION OF NEW RUNWAY CONTROLLER HUT 10 END AT AF STN PUNE
2022_MES_513788_2
8552/E8
Open Tender
Civil Works
Lump-sum
180 days
GE (AF) LOHEGAON
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (AF) LOHEGAON
₹58,000
Yes
24 Jun 2022
26 Apr 2022
11 May 2022
26 Apr 2022
9 May 2022
27 Apr 2022
Amount
NOTE: (i) Serial No 1,Schedule ‘A’ Part I is not Prepriced by MES. Bidder shall insert their rates in green field under colum 06 (ii) Bidders shall carry out soil investigation at work site before finalization of drawing of building work. The cost of soil investigation shall deem to be included in the lumpsum cost to be quoted by the bidder for Srl Item No 1 of BOQ. (iii) Schedule ‘A’ Part II to Part VI under Ser No. 2.00 to 6.00 here in after are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. (iv) The Proprietary 3D Printable concrete mix that is used in fabricating the wall panels should have a minimum 28 days compressive strength. The maximum compressive strength should be around 25 Mpa (v) Each layer in the wall panel should have a layer height of 15-20 mm and layer width of 30-35 mm.
Sch 'A’ Part I.(CONSTRUCTION OF RUNWAY CONTROLLER HUT USING 3D PRINTING WALL PART AT AF STN PUNE INCLUDING CEILING, LINING AND SOUND PROOFING COMPLETE ALL AS SPECIFIED AS PER APPROVED DRAWING) (APPROX PLINTH AREA 90 SQM) Schedule ‘A’ Part I is not Prepriced by MES. Bidder shall insert their rates in green field under colum 06
Lump sum price worked out for INTERNAL ELECTRIFICATION as listed in Sch 'A’ Part II.
Lump sum price worked out for CHEMICAL EARTHING as listed in Sch 'A’ Part III.
Lump sum price worked out for LIGHTENING PROTECTION as listed in Sch 'A’ Part IV.
Lump sum price worked out for EXTERNAL WATER SUPPLY as listed in Sch 'A’ Part V.
Lump sum price worked out for SEWAGE DISPOSAL as listed in Sch 'A’ Part VI.
greenstone construction
Parmanand Enterprises
santulan & Company
KSP ENTERPRISES
M/s Kirti Enterprises
SHIVLING ENTERPRISES
Smruti Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .