| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.1 Cr | 1 | Accepted-AOC valid and accepted |
| 2 | 1₹1.1 CrRejected-Finance | ₹1.1 Cr | 1 | Rejected-Finance reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical not eligible in technical bid |
| 4 | Rejected-Technical | - | - | Rejected-Technical not eligible in technical bid |
| Sl No | Description | Qty | Unit | SRINIVAS CONSTRUCTION L1 | SRI SAMAYAPURAM CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 2,720 | M2 | 62,016 ₹62,016 | 65,443.2 ₹65,443.20 |
| 2.00 | Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification | 816 | M3 | 25,08,335.04 ₹25.1 L | 25,83,586.56 ₹25.8 L |
| 3.00 | Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502 | 8,158 | M2 | 7,02,077.48 ₹7.0 L | 7,23,125.12 ₹7.2 L |
| 4.00 | Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification | 8,158 | M2 | 1,61,283.66 ₹1.6 L | 1,66,096.88 ₹1.7 L |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5 | 408 | M3 | 45,62,798.64 ₹45.6 L | 46,99,682.64 ₹47.0 L |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.024 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 245 | M3 | 28,66,424.05 ₹28.7 L | 29,52,416.6 ₹29.5 L |
| 7.00 | Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH | 119 | M3 | 72,611.42 ₹72,611.42 | 74,790.31 ₹74,790.31 |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
23 Jan 2026, 3:00 pmClosed
EO Papanasam
Balaji nagar, Papanasam Town panchayat
Improvement of BT Road at SPG Mission Street, SPG Mission Street Church Road, kaliyamman Kovil Street, Eithirajulu Road, Ethirajulu Road Cross, suunabukalvai street, Sunnabukalvai street cross, jai Nagar Main, Jai Nagar I,II,III,IV,V,VI Cross
2026_DTP_641910_1
18/2026/A1
Open Tender
Civil Works - Roads
Papanasam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
Papanasam
18 May 2026
10 Jan 2026
24 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
10 Jan 2026
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification
Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.024 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 0.83 MB
BOQ_768847.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid