Loading…
Loading…
Tender Value
Refer Docs
Closing Date
3 Sept 2026, 2:00 pm2d left
Executive Engineer, Public Works Division, Nashik
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel.No.- 0253-2583761-64 2575324
E-Rate Quotation of Non DSR Items for Preparation of Estimate for Installing sculptures on various subjects for beautification purposes in the premises of the Public Works Department at Nashik, Tal. Dist. Nashik
2026_PWR_1329708_1
e-Quotation Notice No.11 for 2026-27
Open Tender
Miscellaneous Works
Item Rate
30 days
Tal. Dist.Nashik
As Per NIT
3 documents required · 3 mandatory
₹0
Exempted
27 Aug 2026
27 Aug 2026
4 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and fixing of sculptures of BRIDGE ON HAND having Size 15' (L) X 15' (W) X 8' (H)1) Make a model with "SHADOO" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity. | 1 | Number | - | - |
| 2 | Supplying and fixing of sculptures of OLAMBA ON HAND having Size 7' (L) X 30' (W) X 12' (H)1) Make a model with "SHADOO" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity. | 1 | Number | - | - |
| 3 | Supplying and fixing of sculptures of ENGINEER (2 Nos.) a having Size 7' (H) X 8" (W))1) Make a model with "SHADOO" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity. | 1 | Number | - | - |
| 4 | Supplying and fixing of sculptures of AFTERNOON LUNCH ON TOOLS having Size 12' (L) X 8' (W) X 5' (H)1) Make a model with "SHADOO" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity. | 1 | Number | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Notice11.pdf
Tender Documents • 2.10 MB
BOQ_2276368.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].