Outsourcing of PSI Maintenance Activities of BSB Division CHPG - GKC Section including HTW/SP of N.E. Railway for 2 Years.
SrDEE-TRD-BSB-2026-27-T06~NER
SrDEE-TRD-BSB-2026-27-T06
Open
Works - General
24 Months
Varanasi, Uttar Pradesh
₹0
₹3.6 L
2 Jul 2026
10 Jun 2026
18 Jun 2026
1-Sub-section - 1 (PSI Maintenance - A)
2-Sub-section - 1 (PSI Maintenance-B)
3-Sub-section-1 (PSI Maintenance-C, Miscellaneous)
Item Breakup - 1-Sub-section - 1 (PSI Maintenance - A)
(b) Half Yearly
(c) Monthly Total 3628529.94 Item- 2 Maintenance of Sectioning Post (SP) & Sub-Sectioning Post (SSP) S No. Item Description of Item Unit Qty Rate Amount No
(b) Half Yearly
(c) Monthly Total 3050350.16 Item- 3 Auxiliary Transformer and Change over panel of TSS, SP & SSP S No. Item Description of Item Unit Qty Rate Amount No
(b)Quarterly Total 3702224.41 Item- 4 Break Down Calls S No. Item Description of Item Unit Qty Rate Amount No
(a) TSS (8 Hrs.)
(b) SP/SSP (8 Hrs.)
(c ) AT (8 Hrs.) Total 1833164.28 Item- 5 Manning of Switching Stations in case of failure of SCADA, VIP movement & OFC block S No. Item Description of Item Unit Qty Rate Amount No
Manning of Switching Stations in case of failure Each of SCADA, VIP movement & OFC block Total 1096160.24 Item- 6 Battery maintenance S No. Item Description of Item Unit Qty Rate Amount No
Battery maintenance VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY Total 1463777.28
Item Breakup - 2-Sub-section - 1 (PSI Maintenance-B)
Erection of Lightening Arrester- 42KV
Erection of Lightening Arrester- 60KV
Erection of CT- 25 KV
Erection of CB- 25 KV
Erection of PT- 25 KV
Erection of BM- 25 KV
Erection of CB- 132 KV
Dismantling of Lightening Arrester- 25KV
Dismantling of Lightening Arrester- 42 KV
Dismantling of Lightening Arrester- 60 KV
Dismantling of CT- 25 KV
Dismantling of PT- 25 KV
Dismantling of CB- 25 KV
Dismantling of BM - 25 KV
Dismantling of CB- 132 KV DP
Erection of battery (one cell) 40 AH
Erection of battery (one cell) 200 AH
Erection of battery (one set = 55 cells) 40 AH
Erection of battery (one set = 55 cells) 200 AH
Erection of Battery charger 40 AH
Erection of Battery charger 200 AH
Dismantling of 10 KVA AT
Erection of 10 KVA AT
Dismantling of 25 KVA AT
Erection of 25 KVA AT
Erection of Auto changeover panel for 10 KVA Each AT
Erection of Auto changeover panel for 25 KVA Each AT
Replacement Transformers Total 109641.59
Item Breakup - 3-Sub-section-1 (PSI Maintenance-C, Miscellaneous)
Rectification of 25 KV Dropout Fuse Total 735509.25 Repair of earth pit/equipment foundation with concrete works by CC foundation (1:3:6) including Item- 9 plastering if required by mortar ratio (1:4) including digging of soil / surface as per instruction of Engineer in charge at site. S No. Item Description of Item Unit Qty Rate Amount No
Repair of earth pit/equipment foundation and cum other repairing works at SP/SSP/TSS with concrete works by CC foundation (1:3:6) including plastering if required by mortar ratio (1:4) including digging of soil/surface as per instruction of Engineer in charge at site. Total 1039684.80 Item- 10 Supply of Steel reinforcement for RCC work S No. Item Description of Item Unit Qty Rate Amount No VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
Supply of Steel reinforcement for RCC work Total 235287.81 Item- 11 Hiring of 15 T Crane on Hourly basis S No. Item Description of Item Unit Qty Rate Amount No
Hiring of 15 T Crane on Hourly basis Total 160609.68 Item- 12 Supply of Ballast/Gravel in the switch Yard S No. Item Description of Item Unit Qty Rate Amount No
Supply of Ballast/Gravel in the switch Yard. Total 90914.50 Item- 13 Spreading of Ballast/Gravel in the switch Yard. S No. Item Description of Item Unit Qty Rate Amount No
Spreading of Ballast/Gravel in the switch Yard. Total 527.00 Provision of Painting & Marking of implantation, emergency phone socket direction, rail level, Km's Item- 14 number of Structures, OHE height and ATD'stemperature marking on ATD structures. S No. Item Description of Item Unit Qty Rate Amount No
Provision of Painting & Marking of implantation, Numbers 9000.00 emergency phonesocket direction, rail level, Km's number of Structures, OHE height and ATD'stemperature marking on ATD structures. Total 875790.00 Provision of painting of balance weight of ATD by Aluminium paint (Double Coat) (Rate inclusive of Item- 15 required material cost i.e Paint, brush etc.) S No. Item Description of Item Unit Qty Rate Amount No
Provision of painting of balance weight of ATD Numbers 600.00 by Aluminium paint (Double Coat) (Rate inclusive of required material cost i.e Paint, brush etc.) Total 74202.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].