| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -29.01% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹21,601.80 (7.76%)Admitted-Fee/PreQual/Technical/Finance | -23.50% | ₹3.0 L+₹21,601.80 (7.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.3 L+₹47,555.33 (17.1%)Admitted-Fee/PreQual/Technical/Finance | -16.88% | ₹3.3 L+₹47,555.33 (17.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.3 L+₹54,925.82 (19.7%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹3.3 L+₹54,925.82 (19.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.4 L+₹62,766.76 (22.6%)Admitted-Fee/PreQual/Technical/Finance | -13.00% | ₹3.4 L+₹62,766.76 (22.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹11,760
Closing Date
24 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
DEVELOPMENT OF PUBLIC PARK AT KHARPORA PHASE I BLOCK DACHNIPORA
2026_RDPR_321265_16
ENIT95 of 2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹11,760
31 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 328.68 | sqm | 91.75 | ₹30,156.39 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftswells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1m from cutting edge: 2.8.1 All kinds of soil : | 14.49 | cum | 479.3 | ₹6,945.06 |
| 3 | Providing & Laying stone soling handpacked in foundation trenches including dressing, watering, compacting and all carriage upto site of work as complete job | 8.03 | cum | 1,000 | ₹8,030 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.26 | cum | 5,733.6 | ₹35,892.34 |
| 5 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 510.48 | kg | 120.8 | ₹61,665.98 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work | 34.32 | sqm | 131.85 | ₹4,525.09 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. | 81 | sqm | 86.75 | ₹7,026.75 |
| 8 | Kota stone slab flooring 25 mm thick over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing, polishing and curing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) : | 93.6 | sqm | 1,891.75 | ₹1,77,067.8 |
| 9 | Renovating lawns including weeding, cheeling the grass, forking the ground, top dressing with sludge or manure mixing the same with forked soil, watering and maintaining the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing & disposal of rubbish as directed, including supplying good earth if needed but excluding the cost of sludge or manure (the good earth shall be paid separately.) | 942.78 | sqm | 34.86 | ₹32,865.31 |
| 10 | Preparation of beds for hedging and shrubbery by excavating upto 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with ludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) | 12.49 | cum | 225.65 | ₹2,818.37 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1072103.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .