Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹11.9 L
Closing Date
25 Jun 2026, 12:00 pm2d left
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Renovation of Banganga Barrage Complex and the Construction of Boundary Wall.
2026_UPIDC_1162313_2
03/SE/2026-27
Open Tender
Civil Works
270 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹11.9 L
Superintending Engineer, Gandak Flood Circle, Bast
20 Jun 2026
20 Jun 2026
25 Jun 2026
20 Jun 2026
25 Jun 2026
20 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W in excavation for foundation with disposal; lead upto 30 m & lift upto 1.5 m for proper completion of the work. | 0.2 | M3 | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work. | - | MT | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Laying C.C. in M-10 Grade (1:3:6) with 20 to 40 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 1 | M3 | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Centering and shuttering for R.C.C. work including cost of all material, labour, T & P etc. for proper completion of the work. | - | M2 | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Laying R.C.C. in M-25 Grade (1:1:2) with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 0.4 | M3 | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Laying R.C.C. in M-20 Grade (1:1.5:3) with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | 0.2 | M3 | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | 1st class brick work with 1st class brick & coarse sand having FM not less than 2.0, including cost of all material, labour and T&P etc. required for proper completion of the work. | 0.2 | M3 | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Laying F.R.C.C. in M-15 Grade (1:2:4) with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work. | - | M3 | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and applying 12 mm thick plaster in 1:4 Cement Mortar including cost of all material, labour, T & P etc. for proper completion of the work. | 1,096 | M2 | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | - | M2 | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Lot_2.pdf
Tender Documents • 1.90 MB
BOQ_2178566.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid