| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance | ₹9.1 L | L1 | Admitted-Finance |
| 2 | L2₹9.1 L+₹2,360 (0.26%)Admitted-Finance | ₹9.1 L+₹2,360 (0.26%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oilfrom transformer into empty oil drum by oil machine, dismantling ofconservatortank and allprotectionrelays,cableend boxes,ventpipes and other items as required. | 1 | Job | 33,900 ₹40,002 | 33,700 ₹39,766 Lowest |
| 1.02 | Cleaningoftransformeroiltank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 2,10,000 ₹2,47,800 Lowest | 2,10,000 ₹2,47,800 Lowest |
| 1.03 | Replacementof top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 59,500 ₹70,210 Lowest | 59,500 ₹70,210 Lowest |
| 1.04 | Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 69,500 ₹82,010 Lowest | 69,500 ₹82,010 Lowest |
| 1.05 | Replacementofsilicagel. | 1 | Job | 8,500 ₹10,030 Lowest | 8,500 ₹10,030 Lowest |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of buccholz relay and protection relays testing the same. | 1 | Job | 48,500 ₹57,230 Lowest | 48,500 ₹57,230 Lowest |
| 1.07 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. | 1 | Job | 76,000 ₹89,680 | 75,000 ₹88,500 Lowest |
| 1.08 | Replacement of transformer oil to up to top up level as required.Make - Transpower | 850 | Ltr. | 1,58,950 ₹1,87,561 Lowest | 1,58,950 ₹1,87,561 Lowest |
| 1.09 | Repair of cooling fins for stopping the leakage. | 3 | Jobs | 30,450 ₹35,931 Lowest | 30,450 ₹35,931 Lowest |
| 1.10 | Dehydration&filtrationofcompletetransformeroilandcheckingthedieelectricstrengthup to50 KVat site. | 1 | Job | 36,800 ₹43,424 | 36,500 ₹43,070 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,200
Closing Date
13 Aug 2026, 3:15 pmClosed
EE ENM M 4
C-Block Near Divya Jyoti Apartment, Sector-19 BPS Rohini, Delhi-89
Servicing Overhauling and dehydration of Voltamp make 1500 KVA Transformer No 1 at Jahangir Puri BPS
2026_DJB_296550_7
NIT No. 09(2026-27)M-4
Open Tender
Miscellaneous Works
Item Rate
60 days
EE ENM M 4
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No. 50448339804
₹18,200
Yes
2 Sept 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oilfrom transformer into empty oil drum by oil machine, dismantling ofconservatortank and allprotectionrelays,cableend boxes,ventpipes and other items as required. | 1 | Job | 80 | ₹80 |
| 1.02 | Cleaningoftransformeroiltank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 80 | ₹80 |
| 1.03 | Replacementof top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 80 | ₹80 |
| 1.04 | Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 80 | ₹80 |
| 1.05 | Replacementofsilicagel. | 1 | Job | 80 | ₹80 |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of buccholz relay and protection relays testing the same. | 1 | Job | 80 | ₹80 |
| 1.07 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. | 1 | Job | 80 | ₹80 |
| 1.08 | Replacement of transformer oil to up to top up level as required.Make - Transpower | 850 | Ltr. | 80 | ₹68,000 |
| 1.09 | Repair of cooling fins for stopping the leakage. | 3 | Jobs | 80 | ₹240 |
| 1.1 | Dehydration&filtrationofcompletetransformeroilandcheckingthedieelectricstrengthup to50 KVat site. | 1 | Job | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_394774.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .