Loading…
Loading…
Tender Value
₹28.5 L
EMD Value
₹57,000
Closing Date
31 Jul 2026, 6:00 pm6d left
GE Gangtok
GE Gangtok New Mil Stn Gangtok Sikkim
PROVN OF TOILET BLOCK NEAR BLDG NO P-315 AND DRAINAGE SYSTEM FROM SHIV MANDIR TO BLDG NO P-309 AND PROVN OF BAY WITH OVERHEAD SHED AT LRW NEAR BLDG NO P-160 ALONGWITH PROVN OF STOVE HOOD (CHIMNI) AND WALL TILES INCL FLOOR IN VEG STORE COOK HOUSE
2026_MES_777763_1
8473/A/E8
Open Tender
Miscellaneous Works
Works
240 days
GE Gangtok New Mil Stn Gangtok Sikkim
As per tender documents
8 documents required · 8 mandatory
₹500
GE Gangtok
₹57,000
Yes
10 Jul 2026
10 Jul 2026
3 Aug 2026
10 Jul 2026
31 Jul 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n.exc 30 cm deep and averaging 15 cm deep and getting out in soft / loose soil soil complete all as specified and directed. | 25 | Sqm | - | - |
| 2 | Excavation over areas, n. exc 1.5m deep and getting out soft/loose soil for septic tank etc complete all as specified and directed. | 18 | Cum | - | - |
| 3 | Excavation over areas, exc 1.5m but n. exc 3.0m deep and getting out soft/loose soil for septic tank etc complete all as specified and directed. | 10.8 | Cum | - | - |
| 4 | Excavation in trenches n.exc 1.5 m wide and not exc 1.5 m in depth for foundation n.exc 10 sqmm on plan and not exc 1.5 mtr in depth and getting out in soft / loose soil etc complete all as specified and directed. | 65 | Cum | - | - |
| 5 | Returning filling in including spreading levelling, watering and well ramming in layers not exc 25 cm thick in soft / loose soil complete all as specified and directed. | 12.65 | Cum | - | - |
| 6 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out, Returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm in soft/loose soil completed all as specified & directed. | 27 | Each | - | - |
| 7 | M&L for sand filling under floor in layers n.exc 25 cm thick including watering, ramming and consolidation etc complete all as specified and directed. | 2.2 | Cum | - | - |
| 8 | Removal of surplus excavated (soil) to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.50 m above the starting point complete all as specified and directed. | 49.7 | Cum | - | - |
| 9 | M&L for Hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface with Broken stone or boulders complete all as specified and as directed. | 2 | Cum | - | - |
| 10 | M&L for PCC (1:4:8), type D2 (using 40mm graded crushed stone aggregates) as in foundation filling and mass concrete complete all as specified and as directed. | 10.15 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocuments8473.pdf
Tender Documents • 0.48 MB
BOQ_871070.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].