| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.7 LAccepted-AOC | ₹10.7 L | 1 | Accepted-AOC work order issued |
| 2 | Rejected-Technical ERAL | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Paramasivan L1 | ATHIVEL L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 86 | Cum | 263 ₹22,618 | 270 ₹23,220 |
| 2.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 6 | Cum | 2,140 ₹12,840 | 2,150 ₹12,900 |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 10 | Cum | 5,670 ₹56,700 | 5,680 ₹56,800 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 97 | Cum | 7,174 ₹7.0 L | 7,180 ₹7.0 L |
| 5.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part M-Sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 9 | Cum | 9,490 ₹85,410 | 9,500 ₹85,500 |
| 6.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc. | |||||
| 6.10 | Plain Surface | 184 | Sqm | 489 ₹89,976 | 495 ₹91,080 |
| 6.20 | Slab & Beam | 19 | Sqm | 1,085 ₹20,615 | 1,090 ₹20,710 |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 900 | Kg | 91.5 ₹82,350 | 95 ₹85,500 |
| 8.00 | Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab | 3 | Sqm | 710 ₹2,130 | 725 ₹2,175 |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
25 Sept 2025, 3:00 pmClosed
Executive Officer
Executive Officer Sawyerpuram Town Panchayat
Construction of Culvert across the Channel Police Quartress to Recovery Park in Sawyerpuram Town panchayat. -- 619-2/ 2025
2025_DTP_606736_1
619-2/ 2025
Open Tender
Civil Works
90 days
Swyerpuram Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,000
Yes
14 Feb 2026
20 Sept 2025
26 Sept 2025
20 Sept 2025
25 Sept 2025
20 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid