| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.3 LAccepted-AOC NO 23A V V | ₹98.3 L Quoted ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹2.3 L (2.25%)Rejected-Finance | ₹1.0 Cr+₹2.3 L (2.25%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | sankaran construction L1 | M/S.KCP CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Puliyambakkam to Sankarapuram Road Km 0/0-1/670 in Puliyambakkam Panchayatat Walajabad Panchayat Union Estimate Amount Rs.98.96 Lakh Manitenance Amount Rs.6.68 Lakh | |||||
| 2.00 | Clearingthe light jungle including all labour charges for burrying and burning etc., complete. | 1,997.04 | Sqm | 5 ₹9,985.2 Lowest | 10 ₹19,970.4 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 2,080.25 | Sqm | 18.3 ₹38,068.58 Lowest | 26 ₹54,086.5 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 599.11 | Cum | 112.5 ₹67,399.88 Lowest | 139 ₹83,276.29 |
| 5.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 6.00 | Km 0/0 - 1/000 | 179.48 | Cum | 515 ₹92,432.2 | 367 ₹65,869.16 Lowest |
| 7.00 | Km 1/0 - 1/670 | 120.08 | Cum | 520 ₹62,441.6 | 380 ₹45,630.4 Lowest |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 936.11 | Cum | 2,560 ₹23,96,441.6 | 2,484 ₹23,25,297.24 Lowest |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 6,251.62 | Sqm | 70 ₹4,37,613.4 Lowest | 85.6 ₹5,35,138.67 |
| 10.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 6,262.5 | Sqm | 19.5 ₹1,22,118.75 Lowest | 25 ₹1,56,562.5 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
20 Feb 2026, 3:00 pmClosed
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Strengthening of Puliyambakkam to Sankarapuram Road Km 0/0-1/670 in Puliyambakkam Panchayat (R-97) at Walajabad Block of Kancheepuram District having PKG. No.TNKPM-13/NBD/2026-27 under NABARD 2026-27
2026_RDTN_656790_1
DIPR/984/Tender/2026, Dt.13.02.2026
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA, Kancheepuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.1 L
Yes
O/o The Project Director, DRDA, Kancheepuram
7 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
17 Feb 2026
Strengthening of Puliyambakkam to Sankarapuram Road Km 0/0-1/670 in Puliyambakkam Panchayatat Walajabad Panchayat Union Estimate Amount Rs.98.96 Lakh Manitenance Amount Rs.6.68 Lakh
Clearingthe light jungle including all labour charges for burrying and burning etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Km stone, Hm stone,& Guardstone,etc.
KM stones
HM stones
Providing 60cm Equilateral triangle board
Providing 90cm Octogon board Stop
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_787612.xls
BOQ • 0.40 MB
TechnicalBid13.pdf
Tender Documents • 0.85 MB
PriceBid13.pdf
Additional Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .