Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance | ₹7.3 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹8.2 L+₹86,392 (11.8%)Accepted-Finance | ₹8.2 L+₹86,392 (11.8%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹8.2 L+₹89,405 (12.2%)Accepted-Finance | ₹8.2 L+₹89,405 (12.2%) | L3 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M/s Aghoreshwar Kripa Construction Co. L3 | TRIDEV INFRACON L2 | M/S B.K. CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 80 Km.) | ||||||
| 2.00 | PCC POLE 8.5 Mtr. | 42 | No | 550 ₹23,100 Lowest | 2,600 ₹1,09,200 | 2,540 ₹1,06,680 |
| 3.00 | STP POLE 11 Mtr. | 14 | No | 450 ₹6,300 Lowest | 2,500 ₹35,000 | 2,450 ₹34,300 |
| 4.00 | ACSR Wisesl Conductor | 5.65 | Km | 1,500 ₹8,475 Lowest | 8,080 ₹45,652 | 8,000 ₹45,200 |
| 5.00 | ACSR Dog Conductor | 1.5 | Km | 1,500 ₹2,250 Lowest | 11,000 ₹16,500 | 10,000 ₹15,000 |
| 6.00DE-CENTRALIZED MATERIALS, Provided by Contractor | ||||||
| 7.00 | STAY ROD | 37 | No | 500 ₹18,500 Lowest | 550 ₹20,350 | 500 ₹18,500 Lowest |
| 8.00 | STAY WIRE 7/10SWG | 340 | Kg | 100 ₹34,000 | 90 ₹30,600 | 80 ₹27,200 Lowest |
| 9.00 | 11KV V-TYPE CROSS ARM | 44 | No | 900 ₹39,600 | 610 ₹26,840 | 600 ₹26,400 Lowest |
| 10.00 | 11K.V.Polymeric Pin Insulator With Nuts & Bolts | 152 | No | 150 ₹22,800 | 140 ₹21,280 | 130 ₹19,760 Lowest |
Tender Value
₹7.3 L
EMD Value
₹8,000
Closing Date
3 Aug 2026, 5:00 pmClosed
se
EDC Sonbhadra
Electrical work
2026_PVVNV_1170016_1
36/EDC(SO)/2026-27
Open Tender
Electrical Works
Item Wise
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹1,180
SE EDC SONEBHADRA Bank A/c No.089105000853
₹8,000
27 Aug 2026
16 Jul 2026
4 Aug 2026
16 Jul 2026
3 Aug 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 80 Km.) | - | - | - | - |
| 2 | PCC POLE 8.5 Mtr. | 42 | No | - | - |
| 3 | STP POLE 11 Mtr. | 14 | No | - | - |
| 4 | ACSR Wisesl Conductor | 5.65 | Km | - | - |
| 5 | ACSR Dog Conductor | 1.5 | Km | - | - |
| 6 | DE-CENTRALIZED MATERIALS, Provided by Contractor | - | - | - | - |
| 7 | STAY ROD | 37 | No | - | - |
| 8 | STAY WIRE 7/10SWG | 340 | Kg | - | - |
| 9 | 11KV V-TYPE CROSS ARM | 44 | No | - | - |
| 10 | 11K.V.Polymeric Pin Insulator With Nuts & Bolts | 152 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Technical.pdf
Tender Documents • 0.48 MB
BOQ_2195448.xls
BOQ • 0.29 MB
DateExtend03072026.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .