| 1 | L1₹3.9 CrAdmitted-Finance | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹43.7 L (11.2%)Admitted-Finance D 13 R D AGA ROAD MIDC INDUSTRIAL AREA CHINCHWAD PUNE PUNE MAHARASHTRA 411019 | PUNE | MAHARASHTRA | 411019 | ₹4.3 Cr+₹43.7 L (11.2%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PARCHEM INDUSTRIES L1 | Thermax Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Design, Manufacturing, testing, Supply, packing, forwarding, handling, erection, performance testing & commissioning with approval of use of new boiler of capacity 8 T/hr with all mountings, accessories, electrical panel without Economiser and construction of civil foundation & mudhole pit/sump at RP, NRB, BARC, Tarapur as per technical specification.
Boiler is to be provided with two feed water pumps (1W X 1S) one running + one stand by. Two fuel oil supply pump (1W X 1S), steam and electric oil pre-heaters, duplex oil filters assembly, forced draught fan with silencer and oil burning equipment. Boiler is fitted with Feed check valves, Steam Stop valves, Non-return Valve, Auxiliary steam stop valve, Automatic Blow down system, Fusible plugs, Water level indicators, pressure gauges, Online flue gas monitoring system, In-line Vortex steam Flowmeter and 2 nos of spring loaded safety valves, and all the mountings and accessories as per IBR approved.
Boiler is fitted with Water level Controller, Combustion safety control, Modulating steam pressure controller for step less modulation of burner, Burner - Monoblock imported burner, Make: Oil on, Type Pressure jet burner suitable for Multi-fuel option – Standard – LDO, LSHS Premium & Natural Gas, customized design for other oil & gas, fuels, Oil temperature Control and instrumentation and all electrical wiring/connections. | 1 | Job | 2,80,97,304 ₹2,80,97,304 Lowest | 3,12,19,226 ₹3,12,19,226 |
| 2.00 | Removal & Disposal of old boiler (as per IBR) with all pipe line, flue gas duct, fittings and accessories.
Removal & Disposal of oil boiler as per IBR rules & regulation , Dismantling & isolation of existing steam circuit, flue gas ducting, water circuit and oil circuit from header as per technical specification. | 37 | MT | 26,550 ₹9,82,350 Lowest | 29,600 ₹10,95,200 |
| 3.00 | Design, supply, fabrication, installation and commissioning of steam line circuit, condensate line, blowdown lines, feed water lines & steam header with suitable IBR approved flanges with proper supports and insulation as per IBR rules and regulation. all IBR formalities including IBR fee, approval of drawings, stage wise inspection & full approval from Dy. Director of steam Boiler, Maharashtra state. if any are in the scope of Contractor only. Hydrostatic pressure testing at 22.5 kg/cm2, LPT examination of steam line, final end connection for steam services and its hot commissioning with IBR formalities including hot thermal insulation for steam & condensate circuit like: Providing, fabrication & installation/ fixing of insulation made out glass wool/LRB lagging with cladding of 24 Gauge Aluminum sheets, etc. for all associated pipe line , valves and fittings. Insulation thickness shall be 75 mm with a glass wool ( Mineral wool) packing density 80 kg/m3. Final finish by Aluminum sheets of gauge 24 as per technical specification. | 600 | Inch meter | 4,425 ₹26,55,000 Lowest | 4,925 ₹29,55,000 |
| 4.00 | Design, supply of materials, fabrication, welding, LPT of joints, installation, testing, cleaning, painting and commissioning of water & oil pipe lines which include CS pipe (ASTM A106 Grade-B), fittings (ASTM A234 Gr WPB), flanges (ASTM A105) along-with associated flanged end with matching flanges as per technical specification. | 300 | Inch meter | 3,540 ₹10,62,000 Lowest | 3,950 ₹11,85,000 |
| 5.10 | Supply & installation of IBR approveed valves for steam line / condensate line / feed water line circuit Supply & Installation of In-line Vortex steam Flowmeter,( For 6" and 8" size steam header) built with A105 carbon steel, 316L stainless steel. Flanged ASME 16.5 Class 150, Flowmeter electronics are available mounted directly to the flow body, or remotely mounted. The electronics housing may be used indoors or outdoors, including wet environments. Available input power options are: dc loop powered (2-wire), dc powered, or ac powered. Three analog output signals are available for your choice of three of the five process variables: mass flow rate, volumetric flow rate, temperature, pressure or fluid density. A pulse output signal for remote totalization and MODBUS or HART communications are also available as per technical specification. | 2 | Nos | 9,73,500 ₹19,47,000 Lowest | 10,81,680 ₹21,63,360 |
| 5.20 | Supply & installation of IBR approved Cast Steel 20 NB glove valve for steam and condensate line | 10 | Nos | 24,780 ₹2,47,800 Lowest | 27,580 ₹2,75,800 |
| 5.30 | Supply & installation of IBR approved Steam PRV , 20 NB | 1 | Nos | 2,42,372 ₹2,42,372 Lowest | 2,66,340 ₹2,66,340 |
| 5.40 | Pressure gauge with syphone tube for 20 NB line , Oprating pressure 3Kg/cm2 | 1 | Nos | 7,080 ₹7,080 Lowest | 7,880 ₹7,880 |
| 5.50 | Supply & installation of IBR approved Cast Steel 40 NB glove valve | 5 | Nos. | 18,880 ₹94,400 Lowest | 20,980 ₹1,04,900 |
| 6.10 | Supply & installation of valves for oil line circuit Cast steel plug valve 15NB | 20 | Nos. | 4,425 ₹88,500 Lowest | 4,920 ₹98,400 |
Tender Value
₹3.5 Cr
EMD Value
₹7 L
Closing Date
22 Dec 2023, 5:00 pmClosed
Dy, CE NRB BARC Tarapur
Dy, CE NRB, BARC Tarapur
Removal and Disposal of old boiler Design Manufacturing Supply Installation Testing and Commissioning of new boiler of capacity 8 Ton per hr at RWM RP NRB BARC Tarapur
2023_NRB_778270_1
NRB/INRPO/RWM/U/5/2023/OPA1866
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
335 days
NRB BARC TARAPUR
As per NIT and Tender Document
4 documents required · 4 mandatory
₹0
₹7 L
27 Sept 2024
9 Nov 2023
8 Jan 2024
9 Nov 2023
22 Dec 2023
24 Nov 2023
9 Nov 2023 - 20 Nov 2023
Amount
Design, Manufacturing, testing, Supply, packing, forwarding, handling, erection, performance testing & commissioning with approval of use of new boiler of capacity 8 T/hr with all mountings, accessories, electrical panel without Economiser and construction of civil foundation & mudhole pit/sump at RP, NRB, BARC, Tarapur as per technical specification. Boiler is to be provided with two feed water pumps (1W X 1S) one running + one stand by. Two fuel oil supply pump (1W X 1S), steam and electric oil pre-heaters, duplex oil filters assembly, forced draught fan with silencer and oil burning equipment. Boiler is fitted with Feed check valves, Steam Stop valves, Non-return Valve, Auxiliary steam stop valve, Automatic Blow down system, Fusible plugs, Water level indicators, pressure gauges, Online flue gas monitoring system, In-line Vortex steam Flowmeter and 2 nos of spring loaded safety valves, and all the mountings and accessories as per IBR approved. Boiler is fitted with Water level Controller, Combustion safety control, Modulating steam pressure controller for step less modulation of burner, Burner - Monoblock imported burner, Make: Oil on, Type Pressure jet burner suitable for Multi-fuel option – Standard – LDO, LSHS Premium & Natural Gas, customized design for other oil & gas, fuels, Oil temperature Control and instrumentation and all electrical wiring/connections.
Removal & Disposal of old boiler (as per IBR) with all pipe line, flue gas duct, fittings and accessories. Removal & Disposal of oil boiler as per IBR rules & regulation , Dismantling & isolation of existing steam circuit, flue gas ducting, water circuit and oil circuit from header as per technical specification.
Design, supply, fabrication, installation and commissioning of steam line circuit, condensate line, blowdown lines, feed water lines & steam header with suitable IBR approved flanges with proper supports and insulation as per IBR rules and regulation. all IBR formalities including IBR fee, approval of drawings, stage wise inspection & full approval from Dy. Director of steam Boiler, Maharashtra state. if any are in the scope of Contractor only. Hydrostatic pressure testing at 22.5 kg/cm2, LPT examination of steam line, final end connection for steam services and its hot commissioning with IBR formalities including hot thermal insulation for steam & condensate circuit like: Providing, fabrication & installation/ fixing of insulation made out glass wool/LRB lagging with cladding of 24 Gauge Aluminum sheets, etc. for all associated pipe line , valves and fittings. Insulation thickness shall be 75 mm with a glass wool ( Mineral wool) packing density 80 kg/m3. Final finish by Aluminum sheets of gauge 24 as per technical specification.
Design, supply of materials, fabrication, welding, LPT of joints, installation, testing, cleaning, painting and commissioning of water & oil pipe lines which include CS pipe (ASTM A106 Grade-B), fittings (ASTM A234 Gr WPB), flanges (ASTM A105) along-with associated flanged end with matching flanges as per technical specification.
Supply & installation of IBR approveed valves for steam line / condensate line / feed water line circuit Supply & Installation of In-line Vortex steam Flowmeter,( For 6" and 8" size steam header) built with A105 carbon steel, 316L stainless steel. Flanged ASME 16.5 Class 150, Flowmeter electronics are available mounted directly to the flow body, or remotely mounted. The electronics housing may be used indoors or outdoors, including wet environments. Available input power options are: dc loop powered (2-wire), dc powered, or ac powered. Three analog output signals are available for your choice of three of the five process variables: mass flow rate, volumetric flow rate, temperature, pressure or fluid density. A pulse output signal for remote totalization and MODBUS or HART communications are also available as per technical specification.
Supply & installation of IBR approved Cast Steel 20 NB glove valve for steam and condensate line
Supply & installation of IBR approved Steam PRV , 20 NB
Pressure gauge with syphone tube for 20 NB line , Oprating pressure 3Kg/cm2
Supply & installation of IBR approved Cast Steel 40 NB glove valve
Supply & installation of valves for oil line circuit Cast steel plug valve 15NB
Supply & installation of 3- Way Ball Valve for Oil Line circuit: - (Valves conform to IS-9890-1981, Class-150,) Size-3” (80 NB ), Type- 3-way ball Valve, T port flange to flange distance-233 mm, L port flange end distance-180 mm, Liquid to be handled- Furnace Oil, Temperature-45C , Bonnet-Bolted Bonnet, MOC- Cast iron and ball- AISI304, Leaver –Carbon steel with PVC sleeve, Details of flanges- Flange OD-170 mm, PCD- 130 mm, I D-50 mm, Flange thickness- 15 mm No. of Holes – 4, Bolt hole size 17 mm as per technical specification.
Supply & installation of Plug valve for Oil Line circuit: Size: 80NB. Valve conform to IS-10459-1983, Class-150,Type- plug Valve, Size-3” (80 mm), Liquid to be handled- Furnace Oil, Temperature- 45C , Bonnet-Bolted Bonnet, MOC- Body: ASTM A216 WCB and Plug- ASTM A351, Leaver –carbon steel with PVC sleeve as per technical specification.
Supply and installation of oil flow meter size -25NB as per technical specification.
Supply & installation of valve of water line circuit Supply and installation of water flow meter size -80 NB as per technical specification.
Ball Valve 80 NB as per technical specification.
Water line Strainer 80 NB as per technical specification.
Supply, fabrication, welding, LPT of joints, installation, testing and commissioning and insulation of IBR approval of steam trap assembly size-15 NB including CS pipe, fittings, flanges, flanged end globe valves, thermodynamic steam traps at steam line and steam header and including insulation.
Pressure gauges ( Range -0-70Kg/Cm2) with siphon tube assembly
Design, fabrication, supply & erection of carbon steel ducting with including proper supports from Boiler to Chimney Dia 750 mm * 6 mmThk. and length 25 meter approximately for handling flue gases of 02 nos. of 8TPH capacity running boilers at a time.
Providing, fabrication & installation/ fixing of insulation made out glass wool/LRB lagging with cladding of 24 Gauge Aluminum sheets, etc. for all associated valves and fittings. Insulation thickness shall be 75 mm with a glass wool packing density 80 kg/m3. Final finish by Aluminum sheets of gauge 24 as per enclosed technical specification.
Steam Header 300 NB, 2 Mtrs Long, Sch 40 Pipe, with one side Flange, Pressure gauge with isolation valve , supporting Legs with following Nozzles, - 150 NB : 2 Nos CL 150 Flange - 200 NB : 3 Nos CL 150 Flange - 25 NB : 1 Nos CL 150 Flange -20 NB : 1 Nos CL 150 Flange
Thermax Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.17 MB
Tendernotice_2.pdf
PDF • 0.53 MB
TECHNICALBID.xls
Additional Documents • 0.05 MB
BOQ_818152.xls
BOQ • 0.29 MB
TenderDocumentBoilerforpdf.pdf
Tender Documents • 3.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .