| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹14.9 L+₹6,774 (0.46%)Rejected-Finance | L2 | Rejected-Finance Greater than lowest | |
| 3 | L3₹14.9 L+₹9,558 (0.65%)Rejected-Finance | L3 | Rejected-Finance Greater than lowest | |
| 4 | L4₹15 L+₹18,368 (1.24%)Rejected-Finance E 112 STREET NO 17 SHASTRI PARK EAST DELHI DELHI 110053 | NORTH EAST DELHI | DELHI | 110053 | L4 | Rejected-Finance Greater than lowest | |
| 5 | L5₹16.9 L+₹2.0 L (13.8%)Rejected-Finance | L5 | Rejected-Finance Greater than lowest |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
12 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT COL SIDDHARTHA YADAV
GE (P) NDA Khadakwasla NDA Khadakwasla Pune
PROVISION OF IRON BRIDGE FOR CROSSING NALLAH IN FIELD CRAFT AREA AT NDA KHADAKWASLA ( SPL WORKS)
2022_MES_533825_1
GE (P) NDA Token 03 of 2022-23/ 8101/E8
Open Tender
Civil Works
Item Rate
180 days
GE(P) NDA Khadakwasla
As per NIT/Tender documents
8 documents required · 8 mandatory
₹500
GE (P) NDA Khadakwasla
₹36,000
3 Oct 2022
27 Jun 2022
15 Aug 2022
27 Jun 2022
12 Aug 2022
25 Jul 2022
14 Jul 2022 - 23 Jul 2022
Amount
Excavation over areas not exc 1.5 mtr deep by mechanical means (Hydraulic excavator) and getting out in any type soil complete all as specified and as directed
Excavation over areas exc 1.5 mtr but not exc 3.0mtr by mechanical means (Hydraulic excavator) deep and getting out in ordinary rock complete all as specified and as directed
M&L for plain cement concrete 1:4:8 type D-2 (using 40 mm graded stone aggregate ) as in foundation filling & mass concrete.
M & L for Ready mix RCC M-25 in foundation incl rafts, footings, foundation ,plinth beam under reamed piles and mass concrete all as spd & directed.
Use and waste of form work to sides of concrete foundation , footings , plinth beam and like etc curved surface and fair finished surfaces of concrete
M & L Ready Mix RCC M-25 (using 20mm graded stone aggregate) as in Walls, retaining walls, basement walls and the like; any thickness; above top of footings; including attached pilasters and buttresses etc for fair finished surfaces of concrete
Use and waste of Formwork to faces of walls, retaining walls, abutments, parapets and staircase railing and similar work including attached pilasters, buttresses of curved surface etc.; vertical or to better for rough finished surfaces of concrete
M & L for TMT bars 10mm dia & over cut to length bent to shape required including cranking bending etc & binding with MS wire (annealed) not less than 0.90mm dia all as directed
M & L for TMT bars but 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders & over cut to length bent to shape required including cranking bending etc & binding with MS wire (annealed) not less than 0.90mm dia all as directed
M&L for Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all lattice bars, stiffeners, gusset plates, etc. Fe 410-W (Gde E-250) quality A
M&L for Rolled sections as in main and cross beams, hip and jack rafters; purlins where connected to common rafters and running rails and guides for sliding doors; fixed with angle cleats or other connecting plates, Fe 410-W (Gde E-250) quality A
M&L for Plates (plain or chequered) channels. Square cut or notched (ordinary and counter sunk) forming holes, without any attachment
S&F for Framed work such as grills, gratings etc., with ends of bars shouldered and/or riveted, or forget into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe 290. Gde-E-165 complete all as specified.
Preparation of new or previously untreated steel surface of any description over 10 cm in width or girth, not otherwise described, applying two coats of synthetic enamel paint over amd including a coat zinc primer complete all as directed.
Removing excavated soil n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point as directed
Removing excavated rock n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point as directed
M & L Providing cement concrete in copings type B1 (1:2:4)) (using 20mm graded stone aggregate) including necessary formwork complete all as directed.
M& L for Hard-core of broken stone gauge not exc. 63 mm, deposited, spread and leveled in layers not exc. 15 cm thick, watered and rammed to a true surface etc complete all as directed
M&L for 75mm thick cement concrete of type D-2 (1:4:8) (using 40mm graded stone aggregate ) as in sub base floor
M&L for 100mm thick cement concrete of type B-1 (1:2:4) (using 20mm graded stone aggregate ) as in floor with even and fair finished without extra cement
M& L for Moorum / red bajri filling in floors or pavings, laid in layers n exc. 15 cm thick spread, leveled and rammed including watering complete all as directed.
ELIEYAS TRADERS
Tejas Enterprises
STUP Infra Pvt. Ltd.
M/S, J.K.CONSTRUCTION
Sayili Enterprises
M/S DEV ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .