Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance H 299 KARAMPURA NEW DELHI 110015 | NEW DELHI | WEST DELHI | DELHI | 110015 | - | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹76.5 L (45.5%)Admitted-Finance | -11.50% | ₹2.4 Cr+₹76.5 L (45.5%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹76.7 L (45.7%)Admitted-Finance | -11.75% | ₹2.4 Cr+₹76.7 L (45.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.6 Cr+₹88.7 L (52.8%)Admitted-Finance | -7.10% | ₹2.6 Cr+₹88.7 L (52.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.8 Cr+₹1.2 Cr (69.7%)Admitted-Finance B 4 PLOT NO 114 GURU KIRPA BUILDING SHIV SHAKTI NAGAR TN MISHRA MARG NIRMAN NAGAR JAIPUR JAIPUR RAJASTHAN JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | +4.60% | ₹2.8 Cr+₹1.2 Cr (69.7%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
19 Jun 2026, 2:00 pmClosed
ANUBHAV KUMAR
As per tender document.
CONSTRUCTION FOR EXPANSION OF RECEIVING TERMINAL BUILDING AT PUNE AND CONTROL ROOMBUILDING AT DHABOL.
2026_GAIL_279119_1
GAIL/MU/CnP/OnM/26/C02
Open Tender
Civil Works
Percentage
270 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4.7 L
THROUGH MICROSOFT TEAMS.LINK SHARED IN NIT
11 Aug 2026
29 May 2026
22 Jun 2026
29 May 2026
19 Jun 2026
29 May 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Horizontal Expansion of Control Room Building at GAIL RT Pune (SIZE 7.5MX6.5M) | - | - | - | - |
| 2 | 1. CIVIL WORKS | - | - | - | - |
| 3 | A. DISMANTLING AND DEMOLISHING | - | - | - | - |
| 4 | Demolishing R.C.C. | 15 | M3 | 3,980.95 | ₹59,714.25 |
| 5 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | - | - | - |
| 6 | Demolishing brick work | 10 | M3 | 2,309.48 | ₹23,094.8 |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | - | - | - | - |
| 8 | Dismantling C.I. or asbestos rain water pipe | 10 | M | 84.86 | ₹848.6 |
| 9 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead : | - | - | - | - |
| 10 | Dismantling G.I. pipes (external work) | 10 | M | 167.93 | ₹1,679.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
tender26C02.pdf
Tender Documents • 1.74 MB
SCCSOWTD.pdf
Tender Documents • 16.40 MB
BOQ_325823.xls
BOQ • 0.74 MB
CBA.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .