Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1,675.50Accepted-Finance | L1 | Accepted-Finance ACCEPTED FOR BELOW RATE | |
| 2 | L2₹3,879.50+₹2,204 (131.5%)Accepted-Finance | L2 | Accepted-Finance ACCEPTED FOR MEDIUM RATE | |
| 3 | L3₹5,779.98+₹4,104.48 (245.0%)Accepted-Finance | L3 | Accepted-Finance ACCEPTED FOR HIGHEST RATE | |
| 4 | L4₹12,637+₹10,961.50 (654.2%)Accepted-Finance | L4 | Accepted-Finance ACCEPTED FOR HIGHEST RATE | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
Closing Date
3 Jun 2021, 3:00 pmClosed
SARPANCH AND SACHIV
GP THOMBRA TAL UMRED DIST NAGPUR
SUPPLY MATERIAL FOR SMASHAN BHOOMI SHED AND OTHER WORK AT THOMBRA
2021_NAGPU_690832_1
ZPN/GP/THOMBRA/T2/21-22
Open Tender
Consumables
Item Wise
180 days
VILLAGE THOMBRA
REFER NIT DOCUMENTS
2 documents required · 2 mandatory
₹0
Exempted
5 Jun 2021
28 May 2021
4 Jun 2021
28 May 2021
3 Jun 2021
28 May 2021
Supply Of Material
Metal 80 mm
Metal 40 mm
Metal 20 mm
Murum
Water Tankar
Centring
khadanga
Sand black
Steel 6mm
Steel 8 mm
Steel 10 mm
Steel 12 mm
Steel 16 mm
Steel 20 mm
centring Tar
Bricks red
Bricks white
Roller
Mixer Machine
RCC Pipe 300 mm
RCC Pipe 450 mm
RCC Pipe 600 mm
DITUMEN PAD
Vibrating Machine on rent
Cemet ISI Mark 53 Grade
Imformation Board (2X3 metal with angle)
KRISHNAI HARDWARE AND MATERIAL SUPPLIERS
SONTAKKE TRADERS
Mutkure Traders & Hardware
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .