Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAccepted-Finance NO 315 RAJAVEETHI ARANJI VILLAGE SOMASIPADI POST KILPENNATHUR TALUK TIRUVANNAMALAI DISTRICT 606 611 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606611 | ₹46.0 L | L1 | Accepted-Finance Below Rate quoted |
| 2 | L2₹46.1 LRejected-Finance DOOR NO 7 121 KUDAL NAGAR KUDAL NAGAR KUTTALAM PATTI 626101 | VIRUDHUNAGAR | TAMIL NADU | 626101 | ₹46.1 L | L2 | Rejected-Finance Above Rate quoted |
| Sl No | Description | Qty | Unit | Ayyan Construction L1 | Mani M L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work: STRENGTHENING OF THE ROAD FROM THALLAMPADI ROAD KM KALPOONDI PANCHAYAT )(3/0 4/2) R363 IN KILPENNATHUR BLOCK | |||||
| 1.01Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,Light jungle ,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 1.02 | Km.0/0 - 1/2 | 1,728 | Sq.m | 6 ₹10,368 | 6 ₹10,368 |
| 1.03Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 1.04 | Km.0/0 - 1/2 | 648 | Cu.m | 140 ₹90,720 | 141 ₹91,368 |
| 1.05Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete | |||||
| 1.06 | Km.0/0 - 1/1 | 135 | Cu.m | 340 ₹45,900 | 340 ₹45,900 |
| 1.07 | Km.1/0 - 1/2 | 27 | Cu.m | 350 ₹9,450 | 350 ₹9,450 |
| 1.08Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete | |||||
| 1.09 | Km.0/0 - 1/2 | 1,500 | Cu.m | 23 ₹34,500 | 23 ₹34,500 |
Tender Value
₹46.9 L
EMD Value
₹46,850
Closing Date
4 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPEMENT OFFICER (B.PT)
THE BLOCK DEVELOPEMENT OFFICE,KILPENNATHUR
STRENGTHENING OF THE ROAD FROM THALLAMPADI ROAD KM 0/0 TO 1/200 IN KALPOONDI KPANCHAYAT (3/0 4/2)
2026_RDTN_666435_1
ROC.NO.A3/067/2025 DT.13.02.2026_01
Open Tender
Civil Works - Roads
KILPENNATHUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹46,850
Yes
4 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
Name of the Work: STRENGTHENING OF THE ROAD FROM THALLAMPADI ROAD KM KALPOONDI PANCHAYAT )(3/0 4/2) R363 IN KILPENNATHUR BLOCK
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,Light jungle ,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be bitumen as tack coat emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with hot applied themoplastic compound with refleclorising glass beads on
`Providing HM stones
`Providing KM stones
Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TD.pdf
Tender Documents • 1.04 MB
BOQ_800536.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid