| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.9 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹26.7 L+₹3.7 L (16.3%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹27.1 L+₹4.1 L (18.0%)Rejected-Finance | 3 | Rejected-Finance L-3 | |
| 4 | 4₹28.6 L+₹5.7 L (24.9%)Rejected-Finance | 4 | Rejected-Finance L-4 | |
| 5 | 5₹31.0 L+₹8.1 L (35.2%)Rejected-Finance | 5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | SANDHYA SHARMA L6 | DINESH CIVIL CONSTRUCTION CO. L2 | M/S Harish Kumar Contractor L1 | M/S SHRI BALAJI CONSTRUCTION L8 | JAI LAXMI CONTRACTOR L5 | PRAGATI ASSOCIATES L7 | M/S ARYA CONSTRUCTION L3 | Chaudhary Enterprises L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in Dry soil including lift up to 1.5m and lead up to 30 m. and including back filling, Watering ,rammimg and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. Complete But excluding G.S.T. | 747.5 | cum | 80 ₹59,800 | 75 ₹56,062.5 | 70 ₹52,325 | 75 ₹56,062.5 | 75 ₹56,062.5 | 80 ₹59,800 | 67 ₹50,082.5 | 60 ₹44,850 Lowest |
| 2.00 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. | 65.5 | cum | 6,050 ₹3,96,275 | 4,800 ₹3,14,400 Lowest | 5,000 ₹3,27,500 | 6,300 ₹4,12,650 | 6,300 ₹4,12,650 | 6,100 ₹3,99,550 | 5,457 ₹3,57,433.5 | 5,100 ₹3,34,050 |
| 3.00 | Brick Work(M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete | 167.4 | cum | 5,800 ₹9,70,920 | 6,000 ₹10,04,400 | 3,700 ₹6,19,380 Lowest | 5,750 ₹9,62,550 | 5,700 ₹9,54,180 | 5,800 ₹9,70,920 | 4,958 ₹8,29,969.2 | 5,700 ₹9,54,180 |
| 4.00 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material , labour , T&P etc. Required for the proper complition of work | 96.3 | cum | 7,700 ₹7,41,510 | 6,000 ₹5,77,800 | 5,400 ₹5,20,020 Lowest | 7,780 ₹7,49,214 | 7,700 ₹7,41,510 | 7,700 ₹7,41,510 | 6,690 ₹6,44,247 | 6,100 ₹5,87,430 |
| 5.00 | Steel Reinforcement Work i/c Supplying, Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. | 9.2 | MT | 82,000 ₹7,54,400 | 65,000 ₹5,98,000 Lowest | 68,000 ₹6,25,600 | 79,800 ₹7,34,160 | 79,000 ₹7,26,800 | 82,000 ₹7,54,400 | 68,679 ₹6,31,846.8 | 79,500 ₹7,31,400 |
| 6.00 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. | 49.5 | sqm | 850 ₹42,075 | 50 ₹2,475 Lowest | 750 ₹37,125 | 500 ₹24,750 | 450 ₹22,275 | 850 ₹42,075 | 430 ₹21,285 | 480 ₹23,760 |
| 7.00 | Centering& Shuttering work for RCC work i/c cleaning & oiling etc complete for proper compelition of work. | 155 | sqm | 550 ₹85,250 | 500 ₹77,500 | 400 ₹62,000 Lowest | 800 ₹1,24,000 | 780 ₹1,20,900 | 550 ₹85,250 | 707 ₹1,09,585 | 800 ₹1,24,000 |
| 8.00 | Struck Cement Pointing (struck deep) in 1:2 cement sand mortar i/c cost of all Material Labour and T&P etc. as per direction in charge | 206 | sqm | 120 ₹24,720 | 100 ₹20,600 | 70 ₹14,420 Lowest | 120 ₹24,720 | 105 ₹21,630 | 120 ₹24,720 | 102 ₹21,012 | 110 ₹22,660 |
| 9.00 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. | 19 | sqm | 250 ₹4,750 | 100 ₹1,900 Lowest | 175 ₹3,325 | 200 ₹3,800 | 200 ₹3,800 | 250 ₹4,750 | 178 ₹3,382 | 180 ₹3,420 |
| 10.00 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | 3 | RM | 510 ₹1,530 | 100 ₹300 Lowest | 400 ₹1,200 | 160 ₹480 | 155 ₹465 | 510 ₹1,530 | 141 ₹423 | 160 ₹480 |
Tender Value
₹31.5 L
EMD Value
₹64,000
Closing Date
16 Jun 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
Dodhpur Aligarh
Construction of VRB at Km 39.080 of Chandausi Branch in District Sambhal.
2026_UPIDC_1152950_6
03/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
45 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹734
₹64,000
21 Jul 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
16 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for Excavation in Foundation in Dry soil including lift up to 1.5m and lead up to 30 m. and including back filling, Watering ,rammimg and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. Complete But excluding G.S.T. | - | cum | - | - |
| 2 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. | - | cum | - | - |
| 3 | Brick Work(M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete | - | cum | - | - |
| 4 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material , labour , T&P etc. Required for the proper complition of work | 1 | cum | - | - |
| 5 | Steel Reinforcement Work i/c Supplying, Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. | 1 | MT | - | - |
| 6 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. | - | sqm | - | - |
| 7 | Centering& Shuttering work for RCC work i/c cleaning & oiling etc complete for proper compelition of work. | - | sqm | - | - |
| 8 | Struck Cement Pointing (struck deep) in 1:2 cement sand mortar i/c cost of all Material Labour and T&P etc. as per direction in charge | - | sqm | - | - |
| 9 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. | - | sqm | - | - |
| 10 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | - | RM | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_2171782.xls
BOQ • 0.29 MB
tenderbookthreenew.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .