| 1 | L1₹45.1 LQualified | L1 | Qualified MSE, MII, Category: OBC | |
| 2 | L2₹45.2 L+₹8,000 (0.18%)Qualified 00 TEHSIL OFFICE BHULWAL LINK ROAD BHALWAL JAMMU JAMMU KASHMIR 181122 | JAMMU | JAMMU AND KASHMIR | 181122 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹69.7 L+₹24.6 L (54.7%)Qualified | L3 | Qualified MSE, MII, Category: General | |
| 4 | Disqualified B 1 245 NEW DELHI WEST DELHI DELHI 110063 | WEST DELHI | DELHI | 110063 | - | Disqualified MSE, MII, Category: General | |
| 5 | Disqualified 5 3 40 41 3 PLOT NO 7 JEERA COMPOUND R P ROAD SECUNDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | - | Disqualified MSE, MII, Category: General |
Tender Value
₹50.3 L
EMD Value
₹1.5 L
Closing Date
4 Oct 2024, 11:00 amClosed
48 Core OFC Single Mode unarmoured
24 Core OFC Single Mode unarmoured
Digging Laying Pulling installation and commissioning of OFC through HDPE pipe Manually
Digging Laying pulling installation and commissioning of OFC through HDPE pipe 165cm Depth through HDD method
Horizontal laying of cable through wall
HDPE pipe 40 mm diameter with rope
PVC pipe 40 mm diameter with Jointer
Joint Chamber RCC Chamber with cover 3x3x6 feet
Cable marker Concrete route marker Engraved with AFNET OFC
OFC Splice Enclosure 48 port
OFC Splice Enclosure 24 port
High Density Fiber Distribution Frame Rack.
24 PORTS FDF BOX LIU
48 PORTS FDF BOX LIU
144 PORTS FDF BOX LIU
24 CORE OFC Distribution cable LC - LC
a Single mode LC LC Fiber patch cable 1 mtr
b Single mode LC LC Fiber patch cable 2 mtr
c Single mode LC LC Fiber patch cable 5 mtr
d Single mode LC LC Fiber patch cable 10 mtr
e Single mode LC LC Fiber patch cable 20 mtr
Splicing of OFC
OFC Layout Topology Diagram
2.5 Inch GI Pipe BOQ Title PROCUREMENT DIGGING LAYING INSTALLATION AND COMMISSIONING OF OFC AT AFTC
6646504
GEM/2024/B/5165830
Two Packet Bid
48 Core OFC Single Mode unarmoured
150 days
Bengaluru Urban, Karnataka
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
3 yrs
₹3
50%
₹1.5 L
6 Sept 2024
6 Sept 2024
4 Oct 2024
PROCUREMENT DIGGING LAYING INSTALLATION AND
48 Core OFC Single Mode unarmoured
24 Core OFC Single Mode unarmoured
Digging Laying Pulling installation and commissioning of OFC through HDPE pipe Manually
Digging Laying pulling installation and commissioning of OFC through HDPE pipe 165cm Depth through HDD method
Horizontal laying of cable through wall
HDPE pipe 40 mm diameter with rope
PVC pipe 40 mm diameter with Jointer
Joint Chamber RCC Chamber with cover 3x3x6 feet
Cable marker Concrete route marker Engraved with AFNET OFC
OFC Splice Enclosure 48 port
OFC Splice Enclosure 24 port
High Density Fiber Distribution Frame Rack.
24 PORTS FDF BOX LIU
48 PORTS FDF BOX LIU
144 PORTS FDF BOX LIU
24 CORE OFC Distribution cable LC - LC
a Single mode LC LC Fiber patch cable 1 mtr
b Single mode LC LC Fiber patch cable 2 mtr
c Single mode LC LC Fiber patch cable 5 mtr
d Single mode LC LC Fiber patch cable 10 mtr
e Single mode LC LC Fiber patch cable 20 mtr
Splicing of OFC
OFC Layout Topology Diagram
2.5 Inch GI Pipe BOQ Title PROCUREMENT DIGGING LAYING INSTALLATION AND COMMISSIONING OF OFC AT AFTC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6646504.pdf
GEM_BID
ATC_5cc8684d-8087-4da2-bdc71721122300748_COEITS.1234.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
tech_spech_ofc_2024-07-16-10-49-13_90f7d9977491a753ef7ed57621059f7c.pdf
BOQ
boq_item_sample_file_2024-07-16-10-49-13_8328eaf0fc8500b61af02547609e3d29.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .