| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC 225 5 BAGMARI ROAD CALCUTTA 54 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | ₹6.7 L | L1 | Accepted-AOC work order issued |
| 2 | L2₹7.0 L+₹29,974.15 (4.50%)Rejected-Finance | ₹7.0 L+₹29,974.15 (4.50%) | L2 | Rejected-Finance 2nd Lowest Tenderer |
| 3 | L3₹7.0 L+₹36,235.42 (5.44%)Rejected-Finance | ₹7.0 L+₹36,235.42 (5.44%) | L3 | Rejected-Finance 3rd Lowest Tenderer |
Tender Value
₹6.7 L
EMD Value
₹13,500
Closing Date
17 Feb 2026, 12:00 pmClosed
DG(Uttaran Services)
1, Hogg Street Kolkata 700087
RENOVATION OF UTTARAN PASSAGE AT 131/H/24,131/H/25, 111/H/10 R.R.L MITRA RD, 13 C.P ROAD AND DIFFERENT PLACES IN WARD NO 34
2026_KMC_1001425_1
KMC/DG(US)/III/34/13/25-26/US
Open Tender
CIVIL WORKS
Percentage
30 days
With in Borough-III
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹13,500
5 Aug 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work | 0.96 | M3 | - | - |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 1 | SQM | - | - |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 0.48 | M3 | - | - |
| 4 | Labour for taking out old soling edging including removing debris. (a) Single flat soling ( Ref :PWD (Bldg.)-2017, It. No. 15, Page No. 230) | 0.04 | %M2 | - | - |
| 5 | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. ( Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 14) | - | SQM | - | - |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 1 | SQM | - | - |
| 7 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EA | - | - |
| 8 | SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC. (a) Original Works 1.Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm(depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.i) With Pakur variety. (SAIL/TATA/RINL) | - | EA | - | - |
| 9 | 23.Construction of Catch pit 600mmX525mm. (inside measurement) and depth of invert 1000mm. below G.L. with 250mm. thick cement brick work (1:4) over 100mm. thick jhama cement concrete (1:4:8) bed over a layer of brick flat soling including providing 100mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing, brickon- edge flooring with 20 mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying and fixing R.C.P.C. gully grid (5 M.T.load bearing capacity) and 150 mm. dia. C.I. Syphone including cutting hard crust, excavation, dewatering, back filling and removal of spoils as per standard drawing | - | EA | - | - |
| 10 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020) | 0.48 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
Tendernotice_2.pdf
PDF • 0.73 MB
Tendernotice_3.pdf
PDF • 4.67 MB
BOQ_2453831.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .