Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Finance | -32.00% | ₹12.2 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-ITR not submitted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Name of work not mentioned on correctness of bid |
Tender Value
₹17.9 L
EMD Value
₹36,000
Closing Date
10 Aug 2026, 6:00 pmClosed
XEN IFC
Office of the Executive Engineer IFC Division Poonch
Construction of FPW at Potha Bella and Sanai Surankote.
2026_IFC_319577_5
e-NIT No.19 of 2026-27 Dated05-08-2026
Open Tender
Civil Works
Percentage
45 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Yes
XEN IFC POONCH
₹36,000
19 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | JOB 1ST-Construction of FPW at potha bella | - | - | - | - |
| 1.1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | 88.2 | m3 | 187.3 | ₹16,519.86 |
| 1.2 | Hand filling of stones into Gabion crates | 283.5 | m3 | 371.15 | ₹1,05,221.03 |
| 1.3 | Supply of stones | 240.98 | m3 | 700 | ₹1,68,686 |
| 1.4 | Carriage of stones by average distance of 700 m by HL | 240.98 | m3 | 904.28 | ₹2,17,913.39 |
| 1.5 | crates made of Mesh type 10x12 (D+100mm ) Zn+10% AL alloy PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD). Crates of sizes 6mx1.5x1.5m | 992.25 | m2 | 250 | ₹2,48,062.5 |
| 1.6 | Carriage of crate from an average lead of 210 km at the site of work | - | MT | 6,684.85 | - |
| 2JOB 2nd - Flood Protection at sanai | |||||
| 2.1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | 132.3 | m3 | 187.3 | ₹24,779.79 |
| 2.2 | Hand filling of stones into Gabion crates | 378 | m3 | 371.15 | ₹1,40,294.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1059058.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .