Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance SHRI SHEELA | -29.99% | ₹16.1 L | L1 | Admitted-Finance |
| 2 | L2₹16.3 L+₹20,195.56 (1.26%)Admitted-Finance | -29.11% | ₹16.3 L+₹20,195.56 (1.26%) | L2 | Admitted-Finance |
| 3 | L3₹18.4 L+₹2.4 L (14.6%)Admitted-Finance | -19.74% | ₹18.4 L+₹2.4 L (14.6%) | L3 | Admitted-Finance |
| 4 | L4₹18.6 L+₹2.6 L (16.0%)Admitted-Finance | -18.77% | ₹18.6 L+₹2.6 L (16.0%) | L4 | Admitted-Finance |
| 5 | L5₹30.3 L+₹14.3 L (88.7%)Admitted-Finance | +32.13% | ₹30.3 L+₹14.3 L (88.7%) | L5 | Admitted-Finance |
Tender Value
₹22.9 L
EMD Value
₹45,900
Closing Date
6 Jul 2026, 2:00 pmClosed
EOBALI
MBBALI
Civil works
2026_DLB_570915_1
MB-07/2026-27/04
Open Tender
Civil Works
Percentage
120 days
MBBALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO/MDRISL
₹45,900
Yes
13 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking theserviceable material with all ifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below | - | cum | 393.5 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,330 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) | - | cum | 5,360 | - |
| 4 | Providing and Laying Reinforced cement concrete pipe NP4/
prestressed concrete pipe for culverts including jointing ends and
fixing collar with cement mortar 1:2 complete as per clause 1000 &
2900 of MoRT&H specification including all material, labour form
work, machinery.450 mm internal diamete | - | sqm | 2,135 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_1015817.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .