Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC 76 NEAR NSCB COLLAGE PATAKEDA SARNI DISTT BETUL M P | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹3,197 (1.20%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.0 L+₹33,624 (12.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹3.3 L+₹66,516 (24.9%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | AJAY CONSTRUCTIONS | M/s S.K. Traders | SOURABH ENGINEERING | NEELAM ENTERPRISES AND SECURITY SERVICE |
|---|---|---|---|---|---|---|---|
| 1.00Work Part | |||||||
| 1.01 | Laying of 3Cx400 sq.mm. Power Cable
form Head of Conv. 21A/B to Incomer Breaker of MCC-IV.
One Length =150 Mtrs.
For 7 No. of length :- 1050 Mtrs. | 1,050 | Mtr. | 1,10,250 ₹1,30,095 Lowest | 1,12,350 ₹1,32,573 | 1,20,750 ₹1,42,485 | 1,50,150 ₹1,77,177 |
| 1.02 | Termination & Jointing of cable of 3Cx400 sq.mm Size as per jointing procedure. | 21 | Nos | 50,085 ₹59,100.3 Lowest | 50,190 ₹59,224.2 | 52,500 ₹61,950 | 54,873 ₹64,750.14 |
| 1.03 | Removal of 3Cx400 sq.mm Power cable from Conv. 3A/3B, 4A/4B at other sites of CHP-II. | 1,050 | Mtr. | 24,570 ₹28,992.6 Lowest | 24,675 ₹29,116.5 | 31,500 ₹37,170 | 29,536.5 ₹34,853.07 |
| 1.04 | Fabrication & Erection of cable tray and painting of red oxide over it. (150 Mr.) | 5 | MT | 41,350 ₹48,793 Lowest | 41,750 ₹49,265 | 50,000 ₹59,000 | 48,065 ₹56,716.7 |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
15 Nov 2024, 3:00 pmClosed
SE P and W
STPS Sarni
Laying of 3Cx400 Sqmm Power cable cable from head of conveyor No.21A B to Incomer Breaker of MCC 4 of CHP 2 including cable termination or jointing at Both End and Removal of cable at STPS Sarni.
2024_MPPGC_375199_1
WT-4712
Open Tender
Electrical Works
Item Rate
30 days
STPS Sarni
As per NIT
11 documents required · 11 mandatory
₹500
Yes
₹5,400
Yes
12 Aug 2025
24 Oct 2024
19 Nov 2024
24 Oct 2024
15 Nov 2024
24 Oct 2024
Work Part
Laying of 3Cx400 sq.mm. Power Cable form Head of Conv. 21A/B to Incomer Breaker of MCC-IV. One Length =150 Mtrs. For 7 No. of length :- 1050 Mtrs.
Termination & Jointing of cable of 3Cx400 sq.mm Size as per jointing procedure.
Removal of 3Cx400 sq.mm Power cable from Conv. 3A/3B, 4A/4B at other sites of CHP-II.
Fabrication & Erection of cable tray and painting of red oxide over it. (150 Mr.)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .