| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.3 LAccepted-AOC AMGURI HOUSE NO 0 CITY TOWN CHIRANG P O AMGURI P S AMGURI DISTRICT CHIRANG PIN 783393 | CHIRANG | ASSAM | 783393 | L1 | Accepted-AOC Awarded | |
| 2 | L1₹56.3 LRejected-Finance VILL NO 2 CHAPAGURI P O CHAPAGURI DIST CHIRANG BTC ASSAM | CHAPAGURI | CHIRANG | ASSAM | L1 | Rejected-Finance Refer to Financial Minutes. | |
| 3 | Rejected-Technical VILL MAROPARA P O SANTIPUR P S BASUGAON DIST CHIRANG BTAD ASSAM | BASUGAON | CHIRANG | ASSAM | 783372 | - | Rejected-Technical Technically not qualified. Refer Technical minute |
Tender Value
₹59.2 L
EMD Value
₹1.2 L
Closing Date
1 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B.ROAD,GUWAHATI-781005
KHUNGRING AISRIMAISRI WATER HARVESTING PROJECT
2023_SCD_34601_6
Tender/NIT/Pt/2023-24/7736
Open Tender
Civil Works
Item Rate
90 days
Khungring
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,200
₹1.2 L
Yes
19 Sept 2024
11 Dec 2023
2 Jan 2024
11 Dec 2023
1 Jan 2024
19 Dec 2023
Amount
Part-I
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Above GBL
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Below GBL
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
Providing and laying hand tubewell
Providing R.C.C. Signboard including writing engrave lettering
Part-II
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm
Construction of diversion channel to divert the flow of water in up stream of the proposed structure.
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Above GBL
Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing. Below GBL
Plain/reinforced cement concrete 1:2.5:5 nominal mix in foundation with crushed stone nominal size mechanically mixed in substructure complete as per drawings and technical specification.
Plain/reinforced cement concrete 1:2:4 with crushed stone mechanically mixed in substructure complete as per drawings and technical specification
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification
Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification. Boulder laid dry without wire crates.
Providing and laying hand tubewell
Providing R.C.C. Signboard including writing engrave lettering
Part-III
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm
Construction of RCC Chenal
Providing and laying hand tubewell
Providing R.C.C. Signboard including writing engrave lettering
BIJIT BRAHMA
stage.html
html • 0.04 MB
techsummary_56026.pdf
PDF • 1.61 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_56026.pdf
PDF • 1.85 MB
Khungring_Aisrimarisri_AOC.pdf
PDF • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .