Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -7.00% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L1₹1.4 LAdmitted-Finance | -7.00% | ₹1.4 L | L1 | Admitted-Finance |
| 3 | L2₹1.5 L+₹6,000.02 (4.30%)Admitted-Finance | -3.00% | ₹1.5 L+₹6,000.02 (4.30%) | L2 | Admitted-Finance |
| 4 | L3₹1.5 L+₹13,500.04 (9.68%)Admitted-Finance | +2.00% | ₹1.5 L+₹13,500.04 (9.68%) | L3 | Admitted-Finance |
| 5 | L3₹1.5 L+₹13,500.04 (9.68%)Admitted-Finance | +2.00% | ₹1.5 L+₹13,500.04 (9.68%) | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
13 Aug 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_319395_16
e-NIT No. 39 of REW Poonch 2026-27 Dated 04-08-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹3,000
4 Sept 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 4.29 | CUM | 479.3 | ₹2,056.2 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.24 | CUM | 4,826.5 | ₹1,158.36 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | 2.95 | CUM | 5,733.6 | ₹16,914.12 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 1.3 | CUM | 7,571.55 | ₹9,843.02 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.3 | CUM | 7,788.4 | ₹10,124.92 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 108 | KG | 123.2 | ₹13,305.6 |
| 7 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 5.45 | SQM | 241.25 | ₹1,314.81 |
| 8 | Distempering with 1st quality acrylic distemper (ready mixed)having VOC content less than 50 gms/litre,two or more coats on new work of
approved manufacturer, of required shade and colour complete as per manufacturer’s specifications | 5.38 | SQM | 89.91 | ₹483.72 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work | 3.02 | sqm | 131.85 | ₹398.19 |
| 10 | Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS: 15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4 | 15.9 | SQM | 1,107.65 | ₹17,611.64 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1057965.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .