Loading…
Loading…
Tender Value
₹1122.8 Cr
EMD Value
₹22.5 Cr
Closing Date
12 Nov 2026, 3:00 pm
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
Engineering, Procurement and Construction (EPC) Contract for Quadrupling (Laying of New 3rd & 4th Lines) of tracks between Sulehali west and Kurugunta (KQT) stations including Electricfication and Signalling &Telecommunication works in connection with Wadi- Secunderabad Quadrupling project in the state of Karnataka.
EPC-12-CAO-C-SC-2026~SCR
EPC-12-CAO-C-SC-2026
Open
Works - General
36 Months
Unknown (Unspecified Location)
₹0
₹22.5 Cr
31 Aug 2026
31 Aug 2026
29 Oct 2026
158 items across 78 schedules · ₹26,44,443 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Set | 4.00 15258.00 | — | 61,032 | |
| 2 | Set | 4.00 3000.00 | — | 12,000 | |
| Item- 02 | angles of sizes either ISMC 150mmx75mmx6mm and ISA on the requirement from concerned Electricity Board Engineer and one coat of aluminium with all connected accessories etc. | 75mmx75mmx6mm (or) at site including for Double pole | any other dimension necessary clamps, structure mentioned in | as per site bolts, nuts, item No. 1 | washers above |
| Schedule total | ₹73,032 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
26.02.2026_RevisedApprovedlistofBrands.pdf
ATTACHMENT
PublicProcurementPolicy19.07.2024.pdf
ATTACHMENT
samplecalculationsheet.pdf
ATTACHMENT
TrainingofContractorsSiteSupervisor30_07_26.pdf
ATTACHMENT
1.TentativeESPofSUH-WSULEHALLIWEST.pdf
ATTACHMENT
2.TentativeESPofSUHSULEHALLI.pdf
ATTACHMENT
3.TentativeESPofCTCHITTAPUR.pdf
ATTACHMENT
4.TentativeESPofMQRMALKHAIDROAD.pdf
ATTACHMENT
5.TentativeESPofSEMSEDAM.pdf
ATTACHMENT
6.TentativeESPofKQTKURGUNTA.pdf
ATTACHMENT
ProposedAlignmentof3rd4thLines-SUHW-KQTKML.pdf
ATTACHMENT
CompletionDrawing-BrNO8UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO9UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO10UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO11UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO14UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO15UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo16UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo17UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo18UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo19UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo20UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo21UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo22UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo23UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO24UPSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNO26DNSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo27DNFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo28DNFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo29DNFSC-WD_compressed2.pdf
ATTACHMENT
CompletionDrawing-BrNo30DNFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo31DNFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo32DNOLDFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo33UPFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo34DNFSC-WD.pdf
ATTACHMENT
14.toAll-TechCircular04-2022_monitoringGEWorks1_compressed.pdf
ATTACHMENT
19.WorksiteprotectionFlyleaf-4.pdf
ATTACHMENT
2.BafflewallandprotectivescreenRDSOdrgs.pdf
ATTACHMENT
BondingSpecandotherguidelines.pdf
ATTACHMENT
42_44_compressed.pdf
ATTACHMENT
23.TOWERCARANDOHECUMPSIdepotdrg_compressed.pdf
ATTACHMENT
6.ETISPCPSICLS0020.pdf
ATTACHMENT
ImportantTRDguidelines1.pdf
ATTACHMENT
44_46_compressed.pdf
ATTACHMENT
1.RDSOOHESPEC.pdf
ATTACHMENT
1.RDSOPSIReportsandempsch-69-114.pdf
ATTACHMENT
SampleBridgeGADs-2.pdf
ATTACHMENT
SampleFOBGADs.pdf
ATTACHMENT
32_36.pdf
ATTACHMENT
5.3rdpartyinspectionguidelines.pdf
ATTACHMENT
18.ATCLSJunctionBox.pdf
ATTACHMENT
12-16.pdf
ATTACHMENT
36_42.pdf
ATTACHMENT
SpecTISPCOHECWCuAg0131.pdf
ATTACHMENT
4.ElectricalTRDdrawingslinks.pdf
ATTACHMENT
22.standardizationofboards.pdf
ATTACHMENT
11.TI_SPC_RCC_SCADA_0134-pages-11_compressed.pdf
ATTACHMENT
21.All2x25TSSSPSSPRDSOdrawings-2.pdf
ATTACHMENT
20.OHEdepotPSIdepotElectmaindepotandcontractorstoredepotdrgs.pdf
ATTACHMENT
21.All2x25TSSSPSSPRDSOdrawings1.pdf
ATTACHMENT
8.ProtectivescreenMODI.pdf
ATTACHMENT
10.ProvisionofStdISMBtypeofHeightgaugesonoldlinesideofNewDoubling-Triplingworks..pdf
ATTACHMENT
TentativeLSectionKm4to15.pdf
ATTACHMENT
TentativeLSectionKm15to25.pdf
ATTACHMENT
26_32.pdf
ATTACHMENT
ImportantTRDguidelines2.pdf
ATTACHMENT
SampleBridgeGADs-1.pdf
ATTACHMENT
RevisedRFPDocument10.09.26.pdf
ATTACHMENT
TentativeSIPsSUH-KQTSection.pdf
ATTACHMENT
12SixPillarsofConstDeptppt.pdf
ATTACHMENT
03-08.pdf
ATTACHMENT
9.ProvisionofretroreflectivenumberplateonONEmast07.05.2012.pdf
ATTACHMENT
15Spacingofpedestalinsulators-Policy1.pdf
ATTACHMENT
RevisedEPCDocument10.09.26_1.pdf
ATTACHMENT
17.master_list_of_drawings_TI2023_compressed.pdf
ATTACHMENT
24.GEworksCircular04-2022_monitoringGEWorks.pdf
ATTACHMENT
19-21.pdf
ATTACHMENT
21-23.pdf
ATTACHMENT
23-26.pdf
ATTACHMENT
TentativeLSectionKm25to50.pdf
ATTACHMENT
3.TICIVMS2020dt22.08.2022galvanization.pdf
ATTACHMENT
08-12.pdf
ATTACHMENT
Existingsectioningdiagram.pdf
ATTACHMENT
eartingSpecandotherguideline.pdf
ATTACHMENT
16-19.pdf
ATTACHMENT
16.CableTrenchdrgforSSPSPin2x25kvsystem.pdf
ATTACHMENT
CompletionDrawing-BrNo35DNOLDFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo36AFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo37DNFSC-WD.pdf
ATTACHMENT
CompletionDrawing-BrNo39DNFSC-WD_compressed.pdf
ATTACHMENT
CompletionDrawing-BrNo40DNFSC-WD.pdf
ATTACHMENT
STDrawings.pdf
ATTACHMENT
WDKQTCablePathDiagram_compressed_1.pdf
ATTACHMENT
ATWeldingofRailsinConstruction.pdf
ATTACHMENT
BallastprofileforLWRtrack.pdf
ATTACHMENT
RlyBoardRUBDrainageCircularsJun22.pdf
ATTACHMENT
SCRINSTRUCTIONSONFLOORINGSPECIFICATIONS06052022.pdf
ATTACHMENT
SCRPitchingPolicyLetter.pdf
ATTACHMENT
PreinspectionofMaterialbyRITESorRDSORBletterno2000RSG3792dt06092017.pdf
ATTACHMENT
SCRPolicyGuidelinesRUB.pdf
ATTACHMENT
PreinspectionofMaterialbyRITESorRDSORBdt290818.pdf
ATTACHMENT
HandbookTracksideIndicatorBoardsandSignages.pdf
ATTACHMENT
SpecificationsofTrackBallastcorrecteduptoACS1.pdf
ATTACHMENT
GuidelinesforTMTBars28824.pdf
ATTACHMENT
SPECIMENDRGFORPLATFORMAMENITIES.pdf
ATTACHMENT
FabricationSupplyandInspectionofSteelGirdersandBearings.pdf
ATTACHMENT
StandardHeightGuage3Sheets.pdf
ATTACHMENT
Supplyofsteelgirders.pdf
ATTACHMENT
ESO87.pdf
ATTACHMENT
SystemImprovementGudelinesConcretemixdesign21032022.pdf
ATTACHMENT
DrawingsasperESO87.pdf
ATTACHMENT
SystemImprovementGudelinesforbringingeconomyinconcretemixdesign.pdf
ATTACHMENT
CorrigendumtoComprehensiveInstructionsforPassengersAmenities.pdf
ATTACHMENT
SystemImprovementGuidelinesonMaterialstobeusedforPFSurfacePFWallGMWSCtype3311Platformwalls.pdf
ATTACHMENT
SystemImprovementGuidelinesonMaterialstobeusedforPFSurfacePFWallPrecastPFWall_compressed.pdf
ATTACHMENT
SystemImprovementGuidelinesonMaterialstobeusedforPFSurfacePFWallVDCDrgAlt1to712022.pdf
ATTACHMENT
ComprehensiveInstructionsforPassengersAmenities.pdf
ATTACHMENT
SystemImprovementGuidelinesonMaterialstobeusedforPFSurfacePFWall.pdf
ATTACHMENT
LinksofImportantDocumentPolicyGuidelines_1.pdf
ATTACHMENT
Pre-BidLink.pdf
ATTACHMENT
14.toAll-TechCircular04-2022_monitoringGEWorks1_compressed.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .