Loading…
Loading…
Tender Value
₹44.6 L
EMD Value
₹89,240
Closing Date
2 Sept 2026, 4:00 pm5d left
Executive Engineer RnB Division Langate
RnB Division Langate
Construction of Chain Link and Installation of Bio fencing around SWM Plant at MC Langate
2026_PWDJK_322126_1
29/3009-18/2026-27/RnB/Langate Dated 24/08/2026
Open Tender
Civil Works
Percentage
10 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Yes
MH 0059
₹89,240
24 Aug 2026
24 Aug 2026
3 Sept 2026
24 Aug 2026
2 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in All kinds of soil : | 397.44 | Cum | 187.3 | ₹74,440.51 |
| 2 | Earth work in excavation in all kinds of soil by mechinical means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth and dewatering as per the directions of engineer incharge complete job. | 326.22 | Cum | 256.85 | ₹83,789.61 |
| 3 | Supply & laying of dry stone soling including hand packing and ramming including all leads lifts cost & carriages of materials involved upto site of work complete | 38.32 | Cum | 1,000 | ₹38,320 |
| 4 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level in 1: 4: 8 (1 cement: 4 coarse sand: 8 stone aggregate) 20mm nominal size Crushed, including all leds, lifts cost & carriages of materials upto site fo work complete. | 1 | Cum | 5,577.4 | ₹5,571.82 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 173.33 | Cum | 6,941 | ₹12,03,083.53 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work Above plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 94.22 | Cum | 8,722.45 | ₹8,21,829.24 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.19 | Cum | 10,171 | ₹22,274.49 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 174.96 | Kg | 123.2 | ₹21,555.07 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for | 880.7 | Sqm | 286.35 | ₹2,52,188.45 |
| 10 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 156.88 | Sqm | 628.95 | ₹98,669.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1077781.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].