Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 1252 20 M AVNTIKA BHAWAN STATION ROAD MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹4.7 Cr
EMD Value
₹9.5 L
Closing Date
2 Jun 2026, 12:00 pmClosed
S. E. I.W.C. Kanpur
Office of the S.E. IWC 98 Canal Colony Kanpur
Fatehpur feeder ke Km. 2.398 par sthit Gujaini aquadct ke renovation ka karya.
2026_UPIDC_1152478_1
10/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Kanpur Dehat
Technical Bid
2 documents required · 2 mandatory
₹2,720
₹9.5 L
S. E. I.W.C. Kanpur
23 Jul 2026
28 May 2026
2 Jun 2026
28 May 2026
2 Jun 2026
28 May 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhund and Moonj with disposal away from site. | 10,830 | Sqm | - | - |
| 2 | Earthwork in cutting or in embankment in ordinary soil exavation to be in the form of irregular pits and earthwork in embankment to be in 20 cm. layers including ramming and dressing the surface to required levels and slopes and also including 1.50 M lift and 30 M lead as directed by Engineer in charge | 2,789.41 | Cum | - | - |
| 3 | Earthwork in cutting or in embankment in ordinary soil exavation to be in the form of irregular pits and earthwork in embankment to be in 20 cm. layers including ramming and dressing the surface to required levels and slopes and also including 8.0 M lift and 200 M lead as directed by Engineer in charge | 5,467.66 | Cum | - | - |
| 4 | Earthwork in cutting or in embankment in ordinary soil exavation to be in the form of irregular pits and earthwork in embankment to be in 20 cm. layers including ramming and dressing the surface to required levels and slopes and also including 8.0 M lift and 300 M lead as directed by Engineer in charge | 17,052.34 | Cum | - | - |
| 5 | Earth work in foundation in dry ordinary soil (loam/clay/sand) including lift upto 1.8 m and lead upto 30m including backfilling,watering and ramming of excavated earth with removal and disposal of surplus earth as directed by Engineer-in-Charge upto a ditance of 30m from the foundation trenches. | 3,970.96 | Cum | - | - |
| 6 | Prepration of subgrade excluding cost of earth work | 11,238.64 | Sqm | - | - |
| 7 | Supplying and Laying coarse Sand of FM 1.5 or above in seepage drains including cost of all labour material and T&P etc. | 345.82 | Cum | - | - |
| 8 | Supplying and Laying grade gravel 5 to 20 mm in seepage drains including cost of all labour material and T&P etc. | 614.26 | Cum | - | - |
| 9 | Supplying and Laying grade gravel 20 to 40 mm in seepage drains including cost of all labour material and T&P etc. | 484.59 | Cum | - | - |
| 10 | Centering and Shuttering for P.C.C. work including cost of labour material and T&P etc. required for completion of the work. | 3,987.62 | Sqm | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
TenderDocumentLot01.pdf
Tender Documents • 1.62 MB
BOQ_2158944.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .