Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹15.3 L+₹37,365.27 (2.50%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹15.8 L+₹83,324.56 (5.57%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹14.9 L
EMD Value
₹18,700
Closing Date
30 May 2024, 6:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1000mm wide x 200mtr long belt conveyor from 51D and 25L Tandem belt at Mill incline under Bankola Area
2024_ECL_308606_1
ECL/GM/BA/E TENDER/24-25/EnM/23 Dt 20.05.2024
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Shankarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹18,700
8 Aug 2024
20 May 2024
31 May 2024
20 May 2024
30 May 2024
20 May 2024
20 May 2024 - 24 May 2024
Amount
Item Description/ Heading
Transportation and installation of complete drive drum driven drum with gear motor base frame -9.8MT +diacharge unit - 2.48MT+ tail end-1MT+Load Table-1MT +Starter and switches -1.2MT +1000mm wide conveyor structure with top bottom roller and foot stool 200 mtr@68kg/per mtr =13.6MT +2time tailend shifting -2MT+Load table shifting 2times-2MT =total weight =42.14MT
Fitting of tailend& discharge skapper
Belt laying including transporting of belt jointing tensioning trail run etc.
Foundation bolting for fitting of drive unit, discharge unit loop take up & tail end etc =80 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gascutting etc. Considering cost of consumables
Providing Bolt & Nuts 200mtr@ 1.25=250Kg+ Discharge load table- 25Kg
Drive base frame loop take up base & discharge base cement concrete.
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .