Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.1 L+₹2,500 (2.27%)Accepted-Finance | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.2 L+₹5,580 (5.07%)Accepted-Finance | 3 | Accepted-Finance Found Eligible |
Tender Value
₹1.1 L
EMD Value
₹2,200
Closing Date
27 Jun 2025, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair to 3 cusec pump and 250mm footvalve at LIS Lower Manda and repair to 10 cusec pump and 300mm footvalve at Manda 1.
2025_IFC_278434_1
MID/AN/13
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Manda
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹2,200
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
3 Jul 2025
6 Jun 2025
28 Jun 2025
6 Jun 2025
27 Jun 2025
10 Jun 2025
9 Jun 2025
1. Repair of 3 cusec discharge 10 mtr head HC pump unit no.01 installed at LIS Lower Manda. The job involves decoupling the pump from motor and further dismantling the pump top cover from its installed position & shifting of the pump shaft assembly by manual / mechanical means to workshop. Separating shaft, impeller and bushes. Providing/fitting of bearings (6307- 2nos) at driving and non driving end. Providing/fitting of bushes (1 nos.) as per sample. Making necessary repairs to bearing housing. Assembling of the pump parts. Carriage / transportation of the pump assembly back from workshop to the site of LIS. Fitment of pump along with replacement of old damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. 01 no. Complete Job 2. Repairs to 250 mm dia foot valve assembly of pumping unit no. 2 installed at LIS Lower Manda. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. 01 no. Complete Job 3. Repair of 10 cusec discharge 18 mtr head HC pump unit no.01 installed at LIS Manda 1. The job involves decoupling the pump from motor and further dismantling the pump top cover from its installed position & shifting of the pump shaft assembly by manual / mechanical means to workshop. Separating shaft, impeller and bushes. Providing/fitting of bearings (6410 - 2nos) at driving and non driving end . Providing/fitting of bushes (2 nos.) as per sample. Making necessary repairs to bearing housing. Assembling of the pump parts. Carriage / transportation of the pump assembly back from workshop to the site of LIS. Fitment of pump along with replacement of old damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. 01 no. Complete Job 4. Repairs to 300 mm dia foot valve assembly of pumping unit no. 2 installed at LIS Manda1. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. 01 no. Complete Job
R K Electrical and Engineering Works (BID ID -2391312)
Chargotra Trading Co. (BID ID -2392053)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .