Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 L+₹35,588.80 (5.70%)Admitted-Finance | ₹6.6 L+₹35,588.80 (5.70%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | A.S.ENTERPRISES L2 | M.B. Enterprises L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling of 11/0.4 KV power supply of transformer after draw out the VCB from the respective chambers by an expert person from HT panel & transformer. | 1 | Job | 7,650 ₹9,027 | 7,200 ₹8,496 Lowest |
| 1.02 | Dismantling the complete transformer. Removing the top cover, oil tank, silica gel breather and fins etc. lifting the core and coils from the transformer tank. | 1 | Job | 11,700 ₹13,806 | 10,800 ₹12,744 Lowest |
| 1.03 | Debrazing of connections, dismantling of old winding from the transformer core, dismantling of damaged core punching from the T/r, straightening, smoothening of damaged core punching cleaning of old varnish chemically and phosphating treatment of all the core punching F class core plate varnish coating in automatic varnish coating tunnel type temperature controlled conveyorised baking oven uniform thickness test on varnished and baked core punching. Assembling of core punching in T/r by staggering repressing hydraulically, locking of complete assembled T/r core. | 1 | Job | 39,600 ₹46,728 | 38,700 ₹45,666 Lowest |
| 1.04 | Rewinding of 11 KV HT winding limbs, removing the burnt winding. Providing the new DPC copper strips and making the new HT coils as per original. Fixing the coil in transformer core with proper HT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with HT insulation varnishing the HT winding with Dr.Beck oil proof varnish and baking the same. | 3 | Jobs | 2,08,710 ₹2,46,277.8 | 1,94,400 ₹2,29,392 Lowest |
| 1.05 | Re-insulation of 0.4 KV winding limbs, Annealing and cleaning the copper strips, Re- insulation of copper strips with craft paper tape and making the coils as per original shape. Fixing the coils in transformer core with proper LT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with LT insulation, varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Jobs | 1,18,800 ₹1,40,184 | 1,16,100 ₹1,36,998 Lowest |
| 1.06 | Fixing the core and coil in the transformer tank with safe and sound condition. Replacement of top cover gasket and insulator gasket oil seal for stopping the leakage. Replacement of silica gel. | 1 | Job | 18,000 ₹21,240 | 17,100 ₹20,178 Lowest |
| 1.07 | Repairing of tape changer. | 1 | Job | 18,900 ₹22,302 | 18,000 ₹21,240 Lowest |
| 1.08 | Filling the new transformer oil make Power. | 600 | Ltrs | 91,800 ₹1,08,324 | 86,400 ₹1,01,952 Lowest |
| 1.09 | Dehydration of transformer oil. | 1 | Job | 9,900 ₹11,682 | 9,000 ₹10,620 Lowest |
| 1.10 | Assembling the complete transformer and installation the same and testing on load at site. | 1 | Job | 14,950 ₹17,641 | 13,950 ₹16,461 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
1 Jul 2026, 3:00 pmClosed
EE SDW V
Ring Road Andrews Ganj New Delhi 110049
Repairing Renovation of 630 KVA Transformer installed at Vasant Vihar SPS.
2026_DJB_294373_10
N.I.T. No. 05 2026 27
Open Tender
Miscellaneous Works
Works
30 days
Ring Road Andrews Ganj New Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹12,500
8 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of 11/0.4 KV power supply of transformer after draw out the VCB from the respective chambers by an expert person from HT panel & transformer. | 1 | Job | 80 | ₹80 |
| 1.02 | Dismantling the complete transformer. Removing the top cover, oil tank, silica gel breather and fins etc. lifting the core and coils from the transformer tank. | 1 | Job | 80 | ₹80 |
| 1.03 | Debrazing of connections, dismantling of old winding from the transformer core, dismantling of damaged core punching from the T/r, straightening, smoothening of damaged core punching cleaning of old varnish chemically and phosphating treatment of all the core punching F class core plate varnish coating in automatic varnish coating tunnel type temperature controlled conveyorised baking oven uniform thickness test on varnished and baked core punching. Assembling of core punching in T/r by staggering repressing hydraulically, locking of complete assembled T/r core. | 1 | Job | 80 | ₹80 |
| 1.04 | Rewinding of 11 KV HT winding limbs, removing the burnt winding. Providing the new DPC copper strips and making the new HT coils as per original. Fixing the coil in transformer core with proper HT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with HT insulation varnishing the HT winding with Dr.Beck oil proof varnish and baking the same. | 3 | Jobs | 80 | ₹240 |
| 1.05 | Re-insulation of 0.4 KV winding limbs, Annealing and cleaning the copper strips, Re- insulation of copper strips with craft paper tape and making the coils as per original shape. Fixing the coils in transformer core with proper LT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with LT insulation, varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Jobs | 80 | ₹240 |
| 1.06 | Fixing the core and coil in the transformer tank with safe and sound condition. Replacement of top cover gasket and insulator gasket oil seal for stopping the leakage. Replacement of silica gel. | 1 | Job | 80 | ₹80 |
| 1.07 | Repairing of tape changer. | 1 | Job | 80 | ₹80 |
| 1.08 | Filling the new transformer oil make Power. | 600 | Ltrs | 80 | ₹48,000 |
| 1.09 | Dehydration of transformer oil. | 1 | Job | 80 | ₹80 |
| 1.1 | Assembling the complete transformer and installation the same and testing on load at site. | 1 | Job | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_391374.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .