| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.5 LAccepted-Finance | ₹80.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹81.3 L+₹81,317.55 (1.01%)Rejected-Finance | ₹81.3 L+₹81,317.55 (1.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹82.1 L+₹1.6 L (2.00%)Rejected-Finance | ₹82.1 L+₹1.6 L (2.00%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
10 Jul 2026, 11:00 amClosed
EO NP GARHI PUKHTA
NP GARHI PUKHTA
WARD NO 2 MOHALLA RAIDASPURI PURVI MAI AMBEDKAR PARK Mai Barat ghar avm baundri wall nirman karya
2026_DOLBU_1162724_1
1112/NPG/E-Tender/2026-27
Open Tender
Construction Works
Percentage
NP GARHI PUKHTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EO NP GARHI PUKHTA
₹1.9 L
25 Aug 2026
22 Jun 2026
10 Jul 2026
22 Jun 2026
10 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead 1 upto 30 M. as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. | 145.86 | CUM | 189.5 | ₹27,640.47 |
| 2 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 16.34 | CUM | 4,959 | ₹81,030.06 |
| 3 | RCC work with cement, approved coarse sand and 20mm gauge approved stone ballast, coarse sand 3 and cement, in the proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. | 50.66 | CUM | 6,248.5 | ₹3,16,549.01 |
| 4 | centring and shuttring including struting proping etc and removel of form work. | 344.92 | SQM | 285 | ₹98,302.2 |
| 5 | M.S (Tor steel or plain) in plain work such as R.C.C or R.B work including cutting bending for necessary shape and binding of reinforcement excluding cost of binding wire required for proper completion of work. | 4,146.78 | KG | 77.9 | ₹3,23,034.16 |
| 6 | M-150 Brick Work with cement and fine sand in proportion of 1:6 in foundation including supply of all materials labour. Tools & plants etc. required for proper completion of the work | 76.78 | CUM | 5,192 | ₹3,98,641.76 |
| 7 | M-150 Brick Work with cement and fine sand in proportion of 1:6 in super structure including supply of all materials labour. Tools & plants etc. required for proper completion of the work | 83 | CUM | 5,192 | ₹4,30,936 |
| 8 | 12mm thick plaster with cement and fine sand 1:4 over brick work minimum thickness not to be less than lem. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work as per site direction of engineer in | 913 | SQM | 252.5 | ₹2,30,532.5 |
| 9 | M.S. or iron work of M.S.Grills/Stair case railing/gates/trusher/racks etc. such as holding down bolts, holdfast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for pro completion of the work. proper | 262.5 | KG | 89.9 | ₹23,598.75 |
| 10 | Painting on iron work with one coat priming and two coat of approved paint including supply of all material, labour, Tools & plants etc complete. | 21 | SQM | 131.5 | ₹2,761.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_2179452.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .