| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.3 LAccepted-AOC | ₹10.3 L Quoted ₹8.8 L | 1 | Accepted-AOC awarded |
| Sl No | Description | Qty | Unit | KARMAKAR ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Supply of saal wood drum lagging (Size 67" x 6" x 5") | 64 | Nos | 4,417.88 ₹2.8 L |
| 3.00Making of lagging plate and ring of 8mm thick M.S. Plate | ||||
| 4.00 | Requirement of supervisory head (1 hd x 3 shifts x 3 days = 9 hds) | 9 | Hds | 1,218.51 ₹10,966.59 |
| 5.00 | Requirement of Fitter (1 hd x 3 shifts x 3 days = 9 hds) | 9 | Hds | 1,176.82 ₹10,591.38 |
| 6.00 | Requirement of Welder (1 hd x 3 shifts x 3 days = 9 hds) | 9 | Hds | 1,176.82 ₹10,591.38 |
| 7.00 | Requirement of Gas Cutter (1 hd x 3 shifts x 3 days = 9 hds) | 9 | Hds | 1,176.82 ₹10,591.38 |
| 8.00 | Requirement of unskilled labour (6 hd x 3 shifts x 3 days = 9 hds) | 54 | Hds | 1,093.46 ₹59,046.84 |
| 9.00 | Requirement of Hammer Man (1 hd x 3 shifts x 4 days = 9 hds) | 12 | Hds | 1,176.82 ₹14,121.84 |
| 10.00Dismantling of Old Drum Lagging | ||||
Tender Value
₹6.0 L
EMD Value
₹7,600
Closing Date
17 May 2023, 10:00 amClosed
AREA ENGINEER ENM
Office of the General Manager, Kenda Area
Supply and fitting of wooden laggings for winding engine drum at pit no 6 of Lower Kenda Colliery
2023_ECL_278172_1
GM/KND/AE(ENM)/55(TN)/23-24/01
Open Tender
Miscellaneous Works
30 days
Lower Kenda Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,600
7 May 2026
2 May 2023
19 May 2023
3 May 2023
17 May 2023
3 May 2023
3 May 2023 - 10 May 2023
Amount
Item Description/ Heading
Supply of saal wood drum lagging (Size 67" x 6" x 5")
Making of lagging plate and ring of 8mm thick M.S. Plate
Requirement of supervisory head (1 hd x 3 shifts x 3 days = 9 hds)
Requirement of Fitter (1 hd x 3 shifts x 3 days = 9 hds)
Requirement of Welder (1 hd x 3 shifts x 3 days = 9 hds)
Requirement of Gas Cutter (1 hd x 3 shifts x 3 days = 9 hds)
Requirement of unskilled labour (6 hd x 3 shifts x 3 days = 9 hds)
Requirement of Hammer Man (1 hd x 3 shifts x 4 days = 9 hds)
Dismantling of Old Drum Lagging
Requirement of Fitter (1 hd x 2 shifts = 2 hds)
Requirement of Fitter Helper (1 hd x 2 shifts = 2 hds)
Requirement of unskilled labour (5 hd x 2 shifts = 10 hds)
Installation of Lagging Ring, Plate and 60 nos of wooden lagging
Requirement of Supervisor (1 hd x 3 shifts = 3 hds)
Requirement of Fitter (1 hd x 3 shifts = 3 hds)
Requirement of Fitter Helper (1 hd x 3 shifts = 3 hds)
Requirement of unskilled labour (5 hd x 3 shifts = 15 hds)
Requirement of Gas Cutter (1 hd x 3 shifts = 3 hds)
Suplying of Welding Rod (ESAB)
Supplying Industrial D.A.
Supplying Oxygen
Supplying of washer
Supplying of Nut Bolt (3/4 " x 7")
Supplying of 'V' screw
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_287976.xls
BOQ • 0.25 MB
01DSC.pdf
Tender Documents • 0.20 MB
01ProformaForUndertakingAnnexureXVII.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid