Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹5.2 L Quoted ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 L+₹28,077 (6.43%)Rejected-Finance 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.6 L+₹28,077 (6.43%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.9 L+₹52,721 (12.1%)Rejected-Finance DUTTA BAGAN SEN RALEIGH ROAD ASANSOL BARDHAMAN BARDHAMAN 713305 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713305 | ₹4.9 L+₹52,721 (12.1%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.2 L
EMD Value
₹6,500
Closing Date
18 Nov 2023, 5:00 pmClosed
The General Manager
Office of The General Manager, Satgram-Sripur Area
Complete repairing rewinding installation of East India Male 1MVA, 11KV 3.3KV power transformer of Chapuikhas Colliery under Satgram Sripur Area
2023_ECL_293219_1
ECL/SSA/GM/E M/E NIT/2023 24/252 dated 01.11.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Satgram Sripur Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,500
22 Feb 2024
8 Nov 2023
20 Nov 2023
8 Nov 2023
18 Nov 2023
8 Nov 2023
8 Nov 2023 - 10 Nov 2023
Amount
Item description
Dismantling of core & winding from the Transformer Tank & cleaning of all parts of the Transformer properly.
Supply of New Electrolyte grade Copper Conductor for Primary Coil. (Rate : LESS after considering the Old unused Copper Scrap Value) (estimated at proposal stage :- 876.07-415)
Supply of New Electrolyte grade Copper Conductor for Secondary Coil. (Rate : LESS after considering the Old unused Copper Scrap Value) (estimated at proposal stage :- 876.07-415)
Insulation of bare Cu. Conductor for Primary & Secondary by double coated manila paper. (material + labour)
Formation of coil after rewinding of primary & secondary coil including supply of required insulation materials.(material + labour)
Cost of Insulating materials, varnish, pre-compress board paper, oil duct, cotton tape, webbing tape etc.
Cost of wooden forma for formation of Primary & Secondary coil.
Providing neoprene gasket of top cover, inspection cover, Insulator etc.
Cost of brazing with supply of rupaton rod, oxygen, DA, for brazing of all the Primary & secondary connections. (material + labour)
Fitting of core channel, Primary & secondary coils & winding into the transformer tank.
Supply & fixing of new insulator with Cu. Studs, copper nut, bolts, washers for secondary side. (material + labour)
Supply & fixing of tap changer switch including mechanism arrangement & alignment with Transformer tank. (material + labour)
Testing of Transformer
De-hydration and filtration of Transformer oil.
Transportation cost both way & handling charges.
Installation of 1MVA 11KV/3.3 KV Transformer at site, (Chapui Khas Colliery) which includes placement of Transformer, pre-commissioning Testing & energise.(Crane will be provide by ECL free of cost) Details of Pre-Commissioning Testing of Transformer:- i.Insulation resistances Test. ii.High Voltage Pressure Test. iii.Victor group Test. iv.Magnetic Balance Test. v.Voltage ratio on all tap position. vi.Di-electric strength of Transformer Oil.
Total impact of GST for the purpose of CTC
ELECTRO TRADING CO.
JUBILEE ELECTROMECH WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_303712.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .