| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC | ₹8.0 L | 1 | Accepted-AOC Lowest Amount Quoted |
| 2 | 2₹8.1 LRejected-Finance | ₹8.1 L | 2 | Rejected-Finance Highest Quoted |
| Sl No | Description | Qty | Unit | S.KARTHICK L2 | RT CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by departmental officers A) Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | 750 | M3 | 330 ₹2,47,500 | 329.5 ₹2,47,125 Lowest |
| 2.00 | Supply and Delivery of 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. | 450 | M | 251 ₹1,12,950 | 250.5 ₹1,12,725 Lowest |
| 3.00 | Supply and Delivery of 75 mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. | 1,400 | M | 177 ₹2,47,800 | 176.5 ₹2,47,100 Lowest |
| 4.00 | Supply and delivey of 80 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000 | 18 | M | 755 ₹13,590 | 750.5 ₹13,509 Lowest |
| 5.00 | Supply and delivey of 65 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000 | 18 | M | 608 ₹10,944 | 605 ₹10,890 Lowest |
| 6.00 | Conveyance and lowering of 90mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications | 450 | M | 21 ₹9,450 | 20 ₹9,000 Lowest |
| 7.00 | Conveyance and lowering of 75mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications | 1,400 | M | 21 ₹29,400 | 20 ₹28,000 Lowest |
| 8.00 | Towards Jointing of 75 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications | 5 | M | 196 ₹980 | 195 ₹975 Lowest |
| 9.00 | Towards Jointing of 75 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications | 14 | M | 161 ₹2,254 | 159.5 ₹2,233 Lowest |
| 10.00 | Supply and Delivery of 80mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete. | 5 | Nos | 5,888 ₹29,440 | 5,877 ₹29,385 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Executive Officer
Town Panchayat Office, Thirumalayampalayam
Extension of Pipeline at Ward No.03 Babilona Nagar, Bathrakaliyamman Kovil to Murugan Kovil, Ward No.06 Kaliyapuram Public well to Jayakumar Thottam, Ward No.15 Marichettipathy Thottam Area, Pudhu Colony Area in Thirumalayampalayam Town Panchayat
2026_DTP_659303_1
92-2/2026/A1
Open Tender
Civil Works - Others
Works
180 days
Thirumalayampalayam
As per norms
2 documents required · 2 mandatory
₹0
₹10,000
17 Apr 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
17 Feb 2026 - 26 Feb 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by departmental officers A) Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
Supply and Delivery of 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications.
Supply and Delivery of 75 mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications.
Supply and delivey of 80 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000
Supply and delivey of 65 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000
Conveyance and lowering of 90mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications
Conveyance and lowering of 75mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications
Towards Jointing of 75 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications
Towards Jointing of 75 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications
Supply and Delivery of 80mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete.
Supply and Delivery of 65 mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete.
Laying and joining of 80 mm diameter I.S.I.make GI pipes with Proper gradient including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers.
Laying and joining of65 mm diameter I.S.I.make GI pipes with Proper gradient including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers.
Refilling the Excavated earth including well Consolidation including cost and conveyance complete complying with standard specifications and as directed by the departmental Engineers.
stage.html
html • 0.04 MB
techsummary_791025.pdf
finsummary_791025.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.37 MB
BOQ_791025.xls
BOQ • 0.23 MB
Corrigendum3.pdf
PDF • 0.69 MB
corrigendumPipeline.pdf
PDF • 0.87 MB
Pipelinecorrigendum.pdf
PDF • 0.09 MB
Pipelinecorrigendum.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].