Tender Value
₹53.2 L
EMD Value
₹53,205
Closing Date
30 Nov 2026, 5:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, L.I.Division, Subarnapur
O/o the Executive Engineer, L.I.Division, Subarnapur.
Installation and Energisation (Revival and Reinforcement) of DAVLA, FABSI-III,V,VI,VII, PHULMUTHI-IV and BISALPALI-IV Old CLIPs under Ullunda Block (State Plan 2026-27)
2026_OLIC_146069_11
OLIC-SNP-04/2026-27
Open Tender
Civil Works - Lift Irrigation Schemes
Percentage
120 days
Sonepur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹53,205
Yes
16 Nov 2026
16 Nov 2026
1 Dec 2026
16 Nov 2026
30 Nov 2026
16 Nov 2026
16 Nov 2026 - 27 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil such as Hard stiff clay, stiff black cotton, hard red earth, shales, moorum ordinary gravels etc within 50m.Initial lead and 1.5m. Initial lift including rough dressing and levelling the bed and depositing the excavated materials within initial lead at nearby the worksite for reuse including breaking clods and stacking rubble for spreading and leveling as the case may be etc complete as per direction of the Engineer-in-charge. (Excavation by mechanical means 60% &
manually 40%) | 1,030.14 | cum | 126.99 | ₹1,30,817.48 |
| 2 | Filling in F&P with excavated materials in layers not exceeding 0.30m including breaking clods within 50m. initial lead including leveling the tranches as the case may be etc complete as per direction of the Engineer-in-charge.(Quantity by means of Mechanical 60% & mannually 40% i.e. of respective item No. 1 above) | 1,030.14 | cum | 70.55 | ₹72,676.38 |
| 3 | Earth work excavation of foundation in hard soil within initial lead of 50m & lift of 1.5m including dressing and levelling the bed etc.as direction of Engineer-in-charge | 163.15 | cum | 282.89 | ₹46,152.65 |
| 4 | Filling in F&P with excavated materials including well watered and rammed.(2/3 of respective earth work) as direction of Engineer-in-charge | 159.37 | cum | 157.16 | ₹25,046.12 |
| 5 | Filling F and P with sand, well watered and rammed as direction of Engineer-in-charge | 27.32 | Cum | 533.44 | ₹14,575.71 |
| 6 | Cement concrete (1:4:8) with 4cm (1½”) size hard granite metal (Crusher Broken) as direction of Engineer-in-charge | 6.64 | Cum | 5,336.92 | ₹35,426.47 |
| 7 | RCC/Cement Concrete (1:2:4) with 12mm (½”) size hard granite chips (Crusher broken) as direction of Engineer-in-charge | 15.57 | Cum | 7,585.2 | ₹1,18,116.73 |
| 8 | Flyash. Brick masonary in cm(1:6) in foundation and plinth (25cm X 12cm X 8cm size) as direction of Engineer-in-charge | 15.41 | Cum | 5,715.09 | ₹88,092.4 |
| 9 | 12mm thick Cement plaster in CM (1:6) over brick work as direction of Engineer-in-charge | 198.17 | Sqm | 193.09 | ₹38,263.68 |
| 10 | Cement punning over plastering as direction of Engineer-in-charge | 168.07 | Sqm | 41.36 | ₹6,951.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.37 MB
Tendernotice_2.pdf
PDF • 11.43 MB
BOQ_620596.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .