Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Finance | -2.99% | ₹32.9 L | L1 | Admitted-Finance |
| 2 | L2₹33.6 L+₹67,464.94 (2.05%)Admitted-Finance | -1.00% | ₹33.6 L+₹67,464.94 (2.05%) | L2 | Admitted-Finance |
Tender Value
₹33.9 L
EMD Value
₹67,804
Closing Date
14 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-02 Ward-90 ke antargat Nakas Kona se Ghantaghar Chauraha tak Sabzi Mandi Road par RCC nali aur patri nirmaan karya.
2026_NNAMC_1174183_34
40 work of 14.08.2026
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,015
AS PER DOCS
₹67,804
15 Sept 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin damaged brick nali and including stacking of materials with all complete work | 23.26 | cum | 468 | ₹10,885.68 |
| 2 | making Bandha with empaty cement bag filled by local sand or soil etc comp. of work | 15 | Nos. | 991 | ₹14,865 |
| 3 | Dewaterin of nala water by pump etc all complete work. | 20 | day | 800 | ₹16,000 |
| 4 | Earth work Exavation in Ordinary soil lead lift &30 m lead with aqll complete work (S.I.No.251) | 375.9 | cum | 160 | ₹60,144 |
| 5 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 FM. and cement in proportion of 12:6:1 in foundations and 3 under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST (S.I. No. 273) | 49.7 | Cum | 4,900 | ₹2,43,530 |
| 6 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 191.53 | Cum | 9,300 | ₹17,81,229 |
| 7 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 150.35 | qtl | 6,200 | ₹9,32,170 |
| 8 | M.S iron work amall size and section for frame of RCC all complete work (S.I.No.504) for Plane work | 1,805 | kg | 66 | ₹1,19,130 |
| 9 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) | 22.5 | cum | 87.3 | ₹1,964.25 |
| 10 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 12 | cum | 1,654.8 | ₹19,857.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2206649.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .