Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹45.1 L+₹3.1 L (7.38%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹46.6 L+₹4.6 L (10.9%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹47.1 L+₹5.1 L (12.2%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹48.6 L+₹6.6 L (15.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vaishnavi Infrastructure L6 | Shiva Buildtech L2 | GOGIA BROTHERS L5 | AQUA GASEOUS CONTROLS (INDIA) L4 | DEV ENGINEERS L3 | AGS INFRAPROJECTS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Deployment of staff for operation of T/wells at WTP Dwarka & at RWPH Bawana for O&M etc.,the requirement of minimum staff for O&M of 10 Nos T/wells inside WTP Dwarka & at RWPH Bawana. The sites are consisting of HT/LT panels, pumps, motors, valves, NRV's, Transformers, Starter panels,intelligent pump management unit (IPM),feeder panels and Having capacity from 20 HP. Including appurtenances with installation. The staff will also perform the work of Lower and Lifting of pumpsets with minor maintanence. Other associated existing equipment by deploying the following staff in all respects as minimum wage rates.
Shift in charge (Skilled) Staff = 07 nos.
Total = 07 Nos.
Field Assistants (Unskilled) Staff = 07 nos.
Total = 07 nos.
Minor maintenance charges including tools and tackle4s and consumable items like Gland packing, old dhoti, lubricants, minor switch and sockets for internal lightning, PVC tapes and safety measures as required day to day maintenance like Hand gloves, gumboot, safety belts, first aid box, torch etc. except major spare parts/maintenance. Mobile charges for taking report through WhatsApp by NET and calling etc. as per requirement of site for proper communication with staff in every shift including C.P. | 365 | days | 55,11,500 ₹55,11,500 | 38,98,112.4 ₹38,98,112.4 | 42,52,615 ₹42,52,615 | 40,98,950 ₹40,98,950 | 40,47,120 ₹40,47,120 | 37,01,100 ₹37,01,100 Lowest |
| 1.02 | ESI @3.25% & EPF @13.00% | 365 | days | 8,95,710 ₹8,95,710 | 6,09,080.24 ₹6,09,080.24 | 6,09,079.15 ₹6,09,079.15 | 6,08,984.25 ₹6,08,984.25 | 6,09,080.24 ₹6,09,080.24 | 4,96,400 ₹4,96,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
20 Sept 2023, 2:30 pmClosed
Rajender Kumar
40 MGD WTP Nangloi
Deployment of staff for operation and minor maintenance at Tube wells inside WTP Dwarka and at RWPH Bawana under EE EandM WTP-Nangloi
2023_DJB_247124_1
PRESS NIT No. 1 (2023-24) Item No. 1
Open Tender
Miscellaneous Works
Works
365 days
WTP Nangloi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As per tender documents.
₹1 L
22 Sept 2023
6 Sept 2023
20 Sept 2023
6 Sept 2023
20 Sept 2023
6 Sept 2023
Deployment of staff for operation of T/wells at WTP Dwarka & at RWPH Bawana for O&M etc.,the requirement of minimum staff for O&M of 10 Nos T/wells inside WTP Dwarka & at RWPH Bawana. The sites are consisting of HT/LT panels, pumps, motors, valves, NRV's, Transformers, Starter panels,intelligent pump management unit (IPM),feeder panels and Having capacity from 20 HP. Including appurtenances with installation. The staff will also perform the work of Lower and Lifting of pumpsets with minor maintanence. Other associated existing equipment by deploying the following staff in all respects as minimum wage rates. Shift in charge (Skilled) Staff = 07 nos. Total = 07 Nos. Field Assistants (Unskilled) Staff = 07 nos. Total = 07 nos. Minor maintenance charges including tools and tackle4s and consumable items like Gland packing, old dhoti, lubricants, minor switch and sockets for internal lightning, PVC tapes and safety measures as required day to day maintenance like Hand gloves, gumboot, safety belts, first aid box, torch etc. except major spare parts/maintenance. Mobile charges for taking report through WhatsApp by NET and calling etc. as per requirement of site for proper communication with staff in every shift including C.P.
ESI @3.25% & EPF @13.00%
Shiva Buildtech
DEV ENGINEERS
AQUA GASEOUS CONTROLS (INDIA)
GOGIA BROTHERS
Vaishnavi Infrastructure
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .