| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT RECOMMENDED |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT RECOMMENDED |
| Sl No | Description | Qty | Unit | FUTURE FORTUNE INFRASTRUCTURE PRIVATE LIMITED L1 |
|---|---|---|---|---|
| .10EARTH WORK | ||||
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil) including removing, spreading or stacking the spoils within a lead of 3.0 Km as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required including all labour, tool & tackles, machineries etc. to complete job in all respect. | 945 | CU.M | 500 ₹4,72,500 Lowest |
| 2.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer including labour tool & tackles machineries etc. to complete job in all respect.
a) With earth obtained from excavation of foundation. | 1,500 | CU.M | 400 ₹6,00,000 Lowest |
| 3.00 | Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material, tool & tackles etc. complete job as per drawing and technical specification of MoRTH. | 675 | CU.M | 3,600 ₹24,30,000 Lowest |
| 4.00 | Dry stone pitching 300mm thick including supply of stones and preparing surface and laying all labour and material, tool & tackles etc. complete as per direction of Engineer in Charge. | 160 | CU.M | 2,000 ₹3,20,000 Lowest |
| 5.00 | 600mm Boulder filling behind the Abutment with all labour and material, tool & tackles etc. complete job. | 65 | CU.M | 2,000 ₹1,30,000 Lowest |
| 6.00 | Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 100mm dia UPVC pipe Type A ISI marked with all material, transportation, all labour and tool & tackles etc. complete job as per specifications and as directed by Engineer-in-Charge | 82 | METER | 500 ₹41,000 Lowest |
| 7.00Controlled Cement concrete with well graded stone chips (20 mm nominal size) including shuttering and excluding reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in-charge. The minimum cement content shall be 400 kg/m3 in all conditions with Super plasticizer per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula including with all material, transportation, all labour and tool & tackles etc. complete job. | ||||
| 7.10 | M15 GRADE OF CONCRETE | 105 | CU.M | 8,500 ₹8,92,500 Lowest |
| 7.20 | M30 GRADE OF CONCRETE | 350 | CU.M | 13,000 ₹45,50,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
20 May 2024, 4:00 pmClosed
GM WORKS
Bridge and Roof Co. (India) Ltd 427/1 , G.T.ROAD , HOWRAH - 711101
EARTH WORK IN EXCAVATION OF FOUNDATION TRENCHES OR DRAINS, EARTH WORK IN FILLING IN FOUNDATION TRENCHES OR PLINTH WITH GOOD EARTH, PROVIDING AND LAYING OF FILTER MEDIA CONSISTING OF GRANULAR MATERIALS OF GW, GP, SW GROUPS ETC DRY STONE PITCHING
2024_BandR_806214_1
BANDR/ENQ/32922 / NHPC/CIVIL/6944/24-25/01
Open Tender
Miscellaneous Works
Works
75 days
HOWRAH WORKS
As PER TENDER DOCUMENT
16 documents required · 16 mandatory
₹11,800
Bridge and Roof Co.India Ltd
₹3.9 L
10 Jun 2024
6 May 2024
21 May 2024
6 May 2024
20 May 2024
6 May 2024
Amount
EARTH WORK
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil) including removing, spreading or stacking the spoils within a lead of 3.0 Km as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required including all labour, tool & tackles, machineries etc. to complete job in all respect.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer including labour tool & tackles machineries etc. to complete job in all respect. a) With earth obtained from excavation of foundation.
Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material, tool & tackles etc. complete job as per drawing and technical specification of MoRTH.
Dry stone pitching 300mm thick including supply of stones and preparing surface and laying all labour and material, tool & tackles etc. complete as per direction of Engineer in Charge.
600mm Boulder filling behind the Abutment with all labour and material, tool & tackles etc. complete job.
Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 100mm dia UPVC pipe Type A ISI marked with all material, transportation, all labour and tool & tackles etc. complete job as per specifications and as directed by Engineer-in-Charge
Controlled Cement concrete with well graded stone chips (20 mm nominal size) including shuttering and excluding reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in-charge. The minimum cement content shall be 400 kg/m3 in all conditions with Super plasticizer per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula including with all material, transportation, all labour and tool & tackles etc. complete job.
M15 GRADE OF CONCRETE
M30 GRADE OF CONCRETE
Supply and fixing of Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Grade of steel shall be Fe 500D or more confirming to IS : 1786 including with all material, transportation, all labour and tool & tackles etc. complete job.
Supply and Installation of I – section sheet pile made by ISMB250 and 6mm th plate including supplying, fabrication, driving & removing etc. including all labour and tool & tackles etc. complete job.
"NOTE:- TOTAL AMOUNT OF THE WORK AGAINST SL NO 1 ABOVE INCLUDES ALL TAXES DUTIES, ROYALTIES, CESS ENVIRONMENTAL AND POLLUTION FITNESS AND SAFETY CLEARANCE CHARGES ( IF ANY ) OR OTHER INCIDENTAL CHARGES ETC. BUT EXCLUDING GST.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .