CONSTRUCTION OF MINI CSC NEAR KILAIKAVATTAM MADAHAKOIL AT PERAVUR PANCHAYAT KUTHALAM BLOCK MAYILADUTHURAI DISTRICT
2026_RDTN_687884_1
2032/2026/A2 Date 22.07.2026
Open Tender
Civil Works
Item Rate
180 days
Kuthalam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,830
23 Jul 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF MINI CSC BUILDING (TYPE 2) NEAR KILAIKAVATTAM MADHAKOIL AT PERAVUR PANCHAYAT KUTHALAM BLOCK MAYILADUTHURAI DISTRICT | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 17.34 | cu.m | 263.78 | ₹4,573.95 |
| 3 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 6.44 | cu.m | 2,465.93 | ₹15,880.59 |
| 4 | Cement mortar 1:4:8 mix using 40mm ISS metal (Using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 4.02 | cu.m | 6,334.9 | ₹25,466.3 |
| 5 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 (USing M-Sand) and conveyance of all materials to site and all labour charges etc complete (Upto Basement) | 3.93 | cu.m | 6,263.2 | ₹24,614.38 |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 (USing M-Sand) and conveyance of all materials to site and all labour charges etc complete (above Basement) | 5.82 | cu.m | 6,356.07 | ₹36,992.33 |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (Upto Basement) | 3.82 | cu.m | 10,066.49 | ₹38,453.99 |
| 8 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (above Basement) | 2.48 | cu.m | 10,207.56 | ₹25,314.75 |
| 9 | CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 33.04 | Sqm | 547.5 | ₹18,089.4 |
| 10 | For Centering | 8.84 | Sqm | 1,095 | ₹9,679.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Pricebid.pdf
Tender Documents • 0.10 MB
Technicalbid.pdf
Tender Documents • 0.11 MB
BOQ_826802.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].