Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82.2 LAdmitted-Finance | -32.80% | ₹82.2 L | L1 | Admitted-Finance |
| 2 | L2₹85.8 L+₹3.7 L (4.46%)Admitted-Finance | -29.80% | ₹85.8 L+₹3.7 L (4.46%) | L2 | Admitted-Finance |
| 3 | L3₹90.4 L+₹8.2 L (9.97%)Admitted-Finance | -26.10% | ₹90.4 L+₹8.2 L (9.97%) | L3 | Admitted-Finance |
| 4 | L4₹91.5 L+₹9.3 L (11.3%)Admitted-Finance 129 5 MALVIYA ROAD GEORGE TOWN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | -25.20% | ₹91.5 L+₹9.3 L (11.3%) | L4 | Admitted-Finance |
| 5 | L5₹91.7 L+₹9.6 L (11.6%)Admitted-Finance | -24.99% | ₹91.7 L+₹9.6 L (11.6%) | L5 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
29 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-07 Ward-56 Phaphamau me Veer Bahadur ke makan se Bhargava Bhawan hote hue Kali Ghati Dham tak CC road evam nali nirmaan karya
2026_NNAMC_1160772_16
29.06.2026 work of 29
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹14,396
AS PER DOCS
₹2.4 L
25 Aug 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering of Nala by mechanicle pump with all complete work | 60 | Day | 800 | ₹48,000 |
| 2 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 312.16 | cum | 160 | ₹49,945.6 |
| 3 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 51 | cum | 1,654.8 | ₹84,394.8 |
| 4 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 FM. and cement in proportion of 12:6:1 in foundations and 3 under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Excluding GST (S.I. No. 273) | 483 | Cum | 4,900 | ₹23,66,700 |
| 5 | Providing&Laying 100 micron polythene with all complition of work | 3,000 | Rmt | 74.88 | ₹2,24,640 |
| 6 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 450 | Cum | 8,200 | ₹36,90,000 |
| 7 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.286) | 266.35 | Cum | 10,300 | ₹27,43,405 |
| 8 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.284a) | 22.5 | Cum | 9,300 | ₹2,09,250 |
| 9 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 453.49 | qtl | 6,200 | ₹28,11,638 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2175699.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .