| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹2.8 L+₹10,770 (4.07%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹3.3 L+₹69,132 (26.1%)Rejected-Finance VILLAGE MAJHAURA POST SEMAR NANDI DHANGHATA DISTT SANT KABIR NAGAR | SANT KABIR NAGAR | UTTAR PRADESH | L3 | Rejected-Finance Reject | |
| 4 | L4₹3.5 L+₹86,559 (32.7%)Rejected-Finance SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L4 | Rejected-Finance Reject | |
| 5 | L5₹3.7 L+₹1.0 L (38.5%)Rejected-Finance 00 BHUSAR FARM KE PASS K K PURI NANDANPURA JHANSI UTTAR PRADESH 284003 | JHANSI | UTTAR PRADESH | 284003 | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | A K ENTERPRISES L5 | ARUN SINGH L6 | MS SHREYA CONSTRUCTION L4 | SAI CONSTRUCTIONS L2 | M/S SHASHI KANT MISHRA L1 | AARADHYA ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/w in excavation in foundation in all type of soil mixed including back filling of excavated earth, all lead, lift dressing etc. | 44.1 | M3 | 80 ₹3,528 | 80 ₹3,528 | 80 ₹3,528 | 40 ₹1,764 Lowest | 40 ₹1,764 Lowest | 76 ₹3,351.6 |
| 2.00 | Providing & Laying sand below in lining including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer in charge. | 6.3 | M3 | 800 ₹5,040 | 900 ₹5,670 | 750 ₹4,725 | 600 ₹3,780 | 500 ₹3,150 Lowest | 1,024 ₹6,451.2 |
| 3.00 | Laying C.C. (1:3:6) with coarse sand of FM>2.0 and stone ballast 20 mm to 40mm size below in lining bed and side slopes including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer in charge. | 12.6 | M3 | 3,000 ₹37,800 | 4,300 ₹54,180 | 3,800 ₹47,880 | 2,600 ₹32,760 | 2,500 ₹31,500 Lowest | 3,405 ₹42,903 |
| 4.00 | C.R.S. Masonary with 1:3 C.M. including cost of all materials, labours T&P etc. for completion of proper work. | 67.5 | M3 | 4,200 ₹2,83,500 | 4,600 ₹3,10,500 | 3,850 ₹2,59,875 | 3,100 ₹2,09,250 | 2,900 ₹1,95,750 Lowest | 3,625 ₹2,44,687.5 |
| 5.00 | Deep struck cement pointing on stone masonry with 1:2 C.M including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 60 | M2 | 130 ₹7,800 | 110 ₹6,600 | 110 ₹6,600 | 100 ₹6,000 | 90 ₹5,400 Lowest | 102 ₹6,120 |
| 6.00 | Laying cement conrete (1:2:4) for Coaping with coarse sand of FM>2.0 and stone grit 10mm to 20mm size in bed and side slopes including cost of all materials, labour and T&P required for proper completion of work as per direction of Engineer in Charge. | 0.45 | M3 | 6,800 ₹3,060 | 6,800 ₹3,060 | 6,000 ₹2,700 | 6,500 ₹2,925 | 6,500 ₹2,925 | 5,066 ₹2,279.7 Lowest |
| 7.00 | E/w in restoration of canal section in all type of soil mixed including all lead, lift dressing, etc. | 174 | M3 | 150 ₹26,100 | 180 ₹31,320 | 150 ₹26,100 | 110 ₹19,140 Lowest | 140 ₹24,360 | 162 ₹28,188 |
Tender Value
₹4.9 L
EMD Value
₹9,820
Closing Date
10 May 2025, 3:00 pmClosed
Executive Engineer Belan Canal Division Prayagraj
Executive Engineer Belan Canal Division govindpur irrigation colony Prayagraj
Extension/Construction of Wing Wall of Syphon at Km. 6.840 (D/S) of Left Bank of Belan Main Canal.
2025_UPIDC_1035139_1
01/EE/2025-26
Open Tender
Civil Works
Item Wise
20 days
prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹9,820
29 Aug 2025
1 May 2025
10 May 2025
1 May 2025
10 May 2025
1 May 2025
Amount
E/w in excavation in foundation in all type of soil mixed including back filling of excavated earth, all lead, lift dressing etc.
Providing & Laying sand below in lining including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer in charge.
Laying C.C. (1:3:6) with coarse sand of FM>2.0 and stone ballast 20 mm to 40mm size below in lining bed and side slopes including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer in charge.
C.R.S. Masonary with 1:3 C.M. including cost of all materials, labours T&P etc. for completion of proper work.
Deep struck cement pointing on stone masonry with 1:2 C.M including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Laying cement conrete (1:2:4) for Coaping with coarse sand of FM>2.0 and stone grit 10mm to 20mm size in bed and side slopes including cost of all materials, labour and T&P required for proper completion of work as per direction of Engineer in Charge.
E/w in restoration of canal section in all type of soil mixed including all lead, lift dressing, etc.
SAI CONSTRUCTIONS (BID ID -5172549)
AARADHYA ENTERPRISES (BID ID -5174556)
MS SHREYA CONSTRUCTION (BID ID -5171261)
A K ENTERPRISES (BID ID -5169483)
ARUN SINGH (BID ID -5169695)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .