Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance 4 94D RAJA COTTAGE 1ST FLOOR KANYAKULAM PARVATHIPURAM NAGERCOIL KANNIYAKUMARI TAMILNADU 629 003 | KANNIYAKUMARI | TAMIL NADU | 629003 | ₹17.1 L | L1 | Admitted-Finance |
| 2 | L2₹18.6 L+₹1.5 L (8.68%)Admitted-Finance NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | ₹18.6 L+₹1.5 L (8.68%) | L2 | Admitted-Finance |
| 3 | L3₹20.8 L+₹3.7 L (21.9%)Admitted-Finance NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | ₹20.8 L+₹3.7 L (21.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PREMIER ENGINEERING SYSTEMS L3 | ADR ENTERPRISES L1 | MAN ELEVATORS COMPANY PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance of microprocesser controlled VVV frequency drive electric driven passenger lift of 884 kg carrying 13 passenger with ARD facility from ground plus six floors consisting of examining, adjusting, lubricating, greasing the parts including replacement of following mentioned connected parts such as relays, rectifier and indication display, main contactor transformer, brake liner and gear oil, motor oil and servicing, gate lock switches gate levers, gate beaks, gate track rollers, contact switches and limit switches, floor level indication switch and oscillator switch, car counter weight shoes and door and gate shoes, pit switch and safety switches, landing floor indicator, car bush buttons and switches and car indicators, Car top INS Panel board. emergency alarm buttons, up & down indicator cards, aluminium brackets, OSG roller and lubrication, guide lubrication, auto door, track rollers and linking rolls, door locks contact, door lubrication and oil OSG rope, OSG clips and main rope clips, rope tension spring, OSG safety switch, RCR coil rewinding and RCR coil, bolt & nuts, buffer spring, all door track rollers, surclips, travelling cable, LOP & COP buttons with indicators, door opening buzzer, stop button, door stopper, car & landing door, door screen sensor cable, V3F drive, PC board, mother board, guide shoes, door rollers, sensors, door opening and closing belt, door limit switches, door frames, main wheel pulley, main brake wheel fill and etc, main Gear bearing, main motor bearing, door motor rewinding/replacement and cleaning of lift, rubber mat for lifts complete all as specified & directed.
NOTE: if any connected items missing which are not mentioned hereinafter for satisfactory operation of lift shall be deemed to be included in the rate quoted against item rate. All the items mentioned above are included in quoted rate. No extra payment will be made for this.
Make: Kaalika Elevators installed at bldg No P-317 at Map Accn Pkt-I | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 2.00 | All as per item No 1 here in above but Make : Escon Elevators installed at bldg No P-318 MAP accn Pkt I | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 3.00 | All as per item No 1 here in above but Make : Kaalika Elevators installed at bldg No P-319 MAP accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 4.00 | All as per item No 1 here in above but Make : Johnson installed at bldg No P-320 Map accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 5.00 | All as per item No 1 here in above but Make : Kaalika Elevators installed at bldg No P-321 Map accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 6.00 | All as per Item No 1 here in above but Make :Johnson installed at bldg No P-322 Map accn pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 7.00 | All as per item No 1 here in above but Make : Johnson installed at Bldg No P-323 Map Accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 8.00 | All as per item No 1 here in above but Make : Kone installed at Bldg No P-324 Map Accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 9.00 | All as per item No 1 here in above but Make : Escon Elevators installed at bldg No P-325 Map Accn Pkt II | 11 | Per Month | 6,250 ₹68,750 | 4,800 ₹52,800 Lowest | 5,800 ₹63,800 |
| 10.00 | Comprehensive maintenance of microprocesser controlled VVV frequency drive electric driven passenger lift of 554 kg carrying 8 passengers with ARD facility from ground plus five floors consisting of examing, adjusting, lubricating, greasing the parts including replacement of following mentioned connected parts such as relays, rectifier and indication display, main Contactor transformer, brake liner and gear oil, motor oil and servicing, gate lock switches gate levers, gate beaks, gate track rollers, contact switches and limit switches, floor level indication switch and oscillator switch, car counter weight shoes and door and gate shoes, pit switch and safety switches, landing floor indicator, car bush buttons and switches and car indicators, car top INS panel board, emergency alarm buttons, up & down indicator cards, Aluminium brackets, OSG roller and lubrication, guide lubrication, auto door, track rollers and linking rolls, door locks contact, door lubrication and oil OSG rope, OSG clips and main rope clips, rope tension spring, OSG safety switch, RCR coil rewinding and RCR coil, bolt & nuts, buffer spring, all door track rollers, surclips, travelling cable, LOP & COP buttons with indicators, door opening buzzer, stop button, door stopper, V3F drive, car & landing door, door screen sensor cable, PC board, mother board, door opening and closing belt, door limit switches, door frames, main wheel pulley, main brake wheel fill and etc, main Gear bearing, Main motor bearing, Door motor rewinding/replacement and cleaning of lift, rubber mat for lifts complete all as specified & directed.
NOTE: if any connected items missing which are not mentioned hereinafter for satisfactory operation of lift shall be deemed to be included in the rate quoted against item rate. All the items mentioned above are included in quoted rate. No extra payment will be made for this.
Make: Escon Elevators installed at bldg No P-317 at Map Accn Pkt-I | 11 | Per Month | 5,675 ₹62,425 | 4,800 ₹52,800 Lowest | 5,300 ₹58,300 |
Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
2 Sept 2026, 6:00 pmClosed
COL RAJENDER KUMAR
CWE AF NORTH BANGALORE BELLARY ROAD JC NAGAR POST
COMPREHENSIVE MAINT OF LIFTS AT HQTC BANGALORE
2026_MES_770991_2
87429CWEAFNBAN
Open Tender
Civil Works
Item Rate
330 days
GE (AF) BANGALORE
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (AF) BANGALORE
₹41,000
Yes
8 Sept 2026
14 Aug 2026
4 Sept 2026
15 Aug 2026
2 Sept 2026
21 Aug 2026
15 Aug 2026 - 18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance of microprocesser controlled VVV frequency drive electric driven passenger lift of 884 kg carrying 13 passenger with ARD facility from ground plus six floors consisting of examining, adjusting, lubricating, greasing the parts including replacement of following mentioned connected parts such as relays, rectifier and indication display, main contactor transformer, brake liner and gear oil, motor oil and servicing, gate lock switches gate levers, gate beaks, gate track rollers, contact switches and limit switches, floor level indication switch and oscillator switch, car counter weight shoes and door and gate shoes, pit switch and safety switches, landing floor indicator, car bush buttons and switches and car indicators, Car top INS Panel board. emergency alarm buttons, up & down indicator cards, aluminium brackets, OSG roller and lubrication, guide lubrication, auto door, track rollers and linking rolls, door locks contact, door lubrication and oil OSG rope, OSG clips and main rope clips, rope tension spring, OSG safety switch, RCR coil rewinding and RCR coil, bolt & nuts, buffer spring, all door track rollers, surclips, travelling cable, LOP & COP buttons with indicators, door opening buzzer, stop button, door stopper, car & landing door, door screen sensor cable, V3F drive, PC board, mother board, guide shoes, door rollers, sensors, door opening and closing belt, door limit switches, door frames, main wheel pulley, main brake wheel fill and etc, main Gear bearing, main motor bearing, door motor rewinding/replacement and cleaning of lift, rubber mat for lifts complete all as specified & directed.
NOTE: if any connected items missing which are not mentioned hereinafter for satisfactory operation of lift shall be deemed to be included in the rate quoted against item rate. All the items mentioned above are included in quoted rate. No extra payment will be made for this.
Make: Kaalika Elevators installed at bldg No P-317 at Map Accn Pkt-I | 11 | Per Month | - | - |
| 2 | All as per item No 1 here in above but Make : Escon Elevators installed at bldg No P-318 MAP accn Pkt I | 11 | Per Month | - | - |
| 3 | All as per item No 1 here in above but Make : Kaalika Elevators installed at bldg No P-319 MAP accn Pkt II | 11 | Per Month | - | - |
| 4 | All as per item No 1 here in above but Make : Johnson installed at bldg No P-320 Map accn Pkt II | 11 | Per Month | - | - |
| 5 | All as per item No 1 here in above but Make : Kaalika Elevators installed at bldg No P-321 Map accn Pkt II | 11 | Per Month | - | - |
| 6 | All as per Item No 1 here in above but Make :Johnson installed at bldg No P-322 Map accn pkt II | 11 | Per Month | - | - |
| 7 | All as per item No 1 here in above but Make : Johnson installed at Bldg No P-323 Map Accn Pkt II | 11 | Per Month | - | - |
| 8 | All as per item No 1 here in above but Make : Kone installed at Bldg No P-324 Map Accn Pkt II | 11 | Per Month | - | - |
| 9 | All as per item No 1 here in above but Make : Escon Elevators installed at bldg No P-325 Map Accn Pkt II | 11 | Per Month | - | - |
| 10 | Comprehensive maintenance of microprocesser controlled VVV frequency drive electric driven passenger lift of 554 kg carrying 8 passengers with ARD facility from ground plus five floors consisting of examing, adjusting, lubricating, greasing the parts including replacement of following mentioned connected parts such as relays, rectifier and indication display, main Contactor transformer, brake liner and gear oil, motor oil and servicing, gate lock switches gate levers, gate beaks, gate track rollers, contact switches and limit switches, floor level indication switch and oscillator switch, car counter weight shoes and door and gate shoes, pit switch and safety switches, landing floor indicator, car bush buttons and switches and car indicators, car top INS panel board, emergency alarm buttons, up & down indicator cards, Aluminium brackets, OSG roller and lubrication, guide lubrication, auto door, track rollers and linking rolls, door locks contact, door lubrication and oil OSG rope, OSG clips and main rope clips, rope tension spring, OSG safety switch, RCR coil rewinding and RCR coil, bolt & nuts, buffer spring, all door track rollers, surclips, travelling cable, LOP & COP buttons with indicators, door opening buzzer, stop button, door stopper, V3F drive, car & landing door, door screen sensor cable, PC board, mother board, door opening and closing belt, door limit switches, door frames, main wheel pulley, main brake wheel fill and etc, main Gear bearing, Main motor bearing, Door motor rewinding/replacement and cleaning of lift, rubber mat for lifts complete all as specified & directed.
NOTE: if any connected items missing which are not mentioned hereinafter for satisfactory operation of lift shall be deemed to be included in the rate quoted against item rate. All the items mentioned above are included in quoted rate. No extra payment will be made for this.
Make: Escon Elevators installed at bldg No P-317 at Map Accn Pkt-I | 11 | Per Month | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_879003.xls
BOQ • 0.30 MB
87429Tender.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .