Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAccepted-Finance 1103 I SQUARE CORPORATE PARK NEAR SHUKAN MALL CROSS ROAD SCIENCE CITY ROAD SOLA AHMADABAD GUJARAT 380060 | AHMADABAD | AHMEDABAD | GUJARAT | 380060 | L1 | Accepted-Finance Accept | |
| 2 | L2₹46.8 L+₹5.5 L (13.3%)Accepted-Finance 101 SHANAY 1 OPP SHIVALIK PLAZA IIM ATIRA ROAD AMBAVADI AHMEDABAD 380015 GUJARAT INDIA | AHMEDABAD | AHMEDABAD | GUJARAT | 380015 | L2 | Accepted-Finance Accept | |
| 3 | Not Admitted-Fee/PreQual/Technical B 248 BASEMENT BLOCK B CHITTARANJAN PARK NEW DELHI 110019 11 SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
29 Jun 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER PWD WD II DIU
EXECUTIVE ENGINEER PWD WD II FORT ROAD DIU
Consultancy services for Ascertaining Structural Stability and Suggestive Rehabilitation Scheme for Diu Ghoghla Bridge (West side) at Diu. (4th Call)
2020_DIUDT_860_1
RFP e-Tender Notice No. 08/2020-2021
Open Tender
Civil Works - Bridges
Works
120 days
DIU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE ENGINEER PWD WD II DIU
₹50,000
Yes
29 Aug 2020
4 Jun 2020
3 Jul 2020
4 Jun 2020
29 Jun 2020
4 Jun 2020
90 days
Civil Works :
PHASE -l- Safe load carrying capacity test. In this phase, carrying out the existing safe load carryin capacity of the Diu-Ghoghla bridge by load testing using moving vehicle for class -A and above load. (Drawing of Front Elevation and Cross Section of Bridge are enclosed)
PHASE -ll- Checking of bridge structures. In this phase, checking & investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load. a) Checking of protective work. b) Checking of Waterway. c) Checking of foundation. d) Checking of sub-structure. e) Checking of all bearings. f) Checking of superstructure g) Checking of expansion joints h) Checking of wearing cost. i) Checking of drainage/water spout j) Checking of parapets. k) Checking of utilities.
PHASE-lll- Testing and Investigation. In this phase, following tests and investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load a) Non-Destructive tests as per IRC (SP-35) Appendix-8 1) Rebound and penetration tests. 2) Sonic methods. 3) Ultrasonic techniques. 4) Magnetic methods. 5) Electrical methods. 6) Nuclear methods. 7) Radiography. 8) X-Ray diffraction and differential thermal analysis of concrete samples. 9) Electrochemical potentials. 10) Electrical resistivity management. 11) Microscopic examination using optical and polarised light microscopy. 12) Dye penetration test and optical microscopy. 13) Deflection monitoring. 14) Strain measurements. 15) Crack meters.
PHASE-lll- Testing and Investigation. In this phase, following tests and investigation, will be carried out with objective of implementing repairs and rehabilitation if any, to ensure bridge will continue to have ability to carry original design load. b) Destructive tests as per IRC (SP-35) Appendix-8 1) Concrete strength. 2) Carbonation. 3) Endorscope. 4) Pull out test. 5) Pull off test. 6) Internal fracture test. 7) Break off test. 8) Water penetration test. 9) Rapid chloride test and Rapid sulphate test. 10) Analysis of hardened concrete. 11) Optical microscopy and expansion test on concrete cores. Based on the result of the above tests of Phase - II & III, the detailed report along with detailed and rehabilitation scheme will be prepared and submitted to the department.
To provide detailed bill of quantity for the repairing & rehabilitation scheme, if any required and tender documents for execution of the same
To provide corrective supervision during the progress of work
To issue completion certificate & structural stability certificate
DELF CONSULTING ENGINEERS INDIA PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .